My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/08/2005
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2005
>
Agenda - Planning Commission - 08/08/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:37:49 AM
Creation date
8/4/2005 11:20:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/08/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wildlife Research Center <br />Augu,¥t 2, 2005 <br />Page 3 of 3 <br /> <br />Off Street Parking - Design: in accordance with City Code, all parking and maneuvering areas <br />must be surfaced with bituminous and the perimeter of all pavement must be finished with B6/12 <br />concrete curbing. <br /> <br />Drainage and Grading: At the present time, an existing storm sewer runs diagonally through <br />the site. This storm sewer will be relocated along the northern and western perimeter of the site. <br />This existing storm sewer handles water from a ground water recovery system owned by <br />Minnesota Pollution Control Agency and is not available to handle storm water from this site <br /> <br />The runoff from the development is proposed to be collected and discharged into a storm sewer <br />stubbed out of a catch basin located on the east side of Azurite Street in the southwest 6orner of <br />the site. This storm water stub does not have sufficient capacity to handle all of the storm water <br />generated from this site. The storm sewer system should be reconfigured to transmit the storm <br />water to the existing catch basin located on the west side'ofAzurite Street Opposite the northwest <br />comer of the subject property. The outlet Pipe from this catch basin into the regional storm sewer <br />pond may need to be replaced because of the ,increased flow. <br /> <br />REU Number: This site will incur a quarterly storm water charge, which is based upon the <br />amount of impervious area. This development will have an increase in its residential equivalent <br />unit number (REU) as a result of the larger impervious area. This number will be determined <br />when infbrmation is submitted on the total lot and impervious areas. <br /> <br />The Planning Commission will be meeting at 7:00 p.m. on Monday, August 8, 2005 at the <br />Ramsey Fire Station, 1505(3 Armstrong BI. vd., to review the proposed site plan. You or your <br />representative should be present to answer any questions that may arise. Thank you for your <br />cooperation in this process. <br /> <br />ffyou have any questions, please call us at (763) 427-1410. <br /> <br />Respectfi~lly, <br /> <br />Management Intern <br /> <br />Steve Jankowski <br />City Engineer <br /> <br />123 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.