Laserfiche WebLink
Finctl Plat and Final Site Plan Review; Town Center Gardens Srd Addition <br />August 5, 2005 <br />Page 7 of 7 <br />Ground Cover/Irrigation: The development is required to establish sod in all areas not <br />improved with structures or pavement. An irrigation system will need to be provided throughout <br />the development where sodded and landscaped areas will be established. Any irrigation systems <br />will need to be reviewed and approved by the City Engineer. <br /> <br />Mailbox Location: The placement of mailboxes for the townhome units should be located along <br />the private streets when possible. Location of mailboxes along public streets will need to be <br />clustered and is subject to the review and approval of the Streets Supervisor. <br /> <br />Address Signage: The City will be requiring an address location sign (specifying the unit <br />addresses) to be placed at the entrance of all private streets. The required signage will assist <br />emergency services in locating a specific unit when called to the site. The address signage is <br />subject to the review and approval of the City Engineer and Police Chief. <br /> <br />REU Number: The City has enacted a quarterly drainage utility charge that is applicable to the <br />proposed development. Townhouses and single-family units are charged the same rate. <br /> <br />Other Permits: The developer is responsible for obtaining any permits required from other <br />regulatory agencies. <br /> <br />The City Council will be meeting at 7:00 p.m. on Tuesday, August 9, 2005, at Ramsey Fire <br />Station, 15050 Armstrong Blvd., to review your final plat and final site plan. A copy of the case <br />cover sheet is enclosed for your information. I suggest that you, or your representative, be <br />present at the meeting to answer any questions that may arise. If you have any questions or need <br />additional information, please don't hesitate to call us. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Leonard Linton <br />Civil Engineer P.E. <br /> <br />~nclosures <br /> <br />Cc: <br /> <br />Tony Herbert <br />Pioneer Engineering <br />625 Highway 10 N.E. <br />Blaine, MN 55434 <br /> <br /> <br />