Laserfiche WebLink
Owner: City of Ramsey Owner's Project No.: CP# 21-00; 21-07 <br />Engineer: Bolton & Menk, Inc. Engineer's Project No.: 0R1.124017 <br />Contractor: Kuechle Underground, Inc. Contractor's Project No.: <br />Project: Riverdale Drive Improvements Agency's Project No.: SAP 199-108-004; 199-010-013 <br />Contract: <br />Application No.: 4 Application Period: From 07/02/21 to 07/30/21 Application Date: 08/05/21 <br />Balance to Finish (F - J) <br />($) <br />Original Contract <br />1 (MOBILIZATION I 1.00 I LUMP SUM I 25,000.00 I 25,000.00I 1.001 25,000.00 I I 25,000.001 100%I <br />(350.00 <br />, , <br />O O <br />lD O <br />al <br />N <br />(510.00 <br />3.00 <br />(687.00 <br />334.35 <br />O p <br />O p <br />01 M <br />•� <br />o , <br />O <br />r-I <br />o , <br />.� <br />O LO <br />.� <br />lD <br />N <br />M <br />O O <br />Ln <br />N <br />c I <br />r-1 <br />Lo , <br />.� <br />(3,127.40 <br />(3,018.32 <br />13,688.77 <br />, , <br />O Ls-4 <br />N o0 <br />TO W <br />M <br />`� <br />, <br />W <br />M <br />ri <br />, , <br />, , <br />, O <br />O <br />O <br />Ln <br />Ol <br />(5,400.00 <br />(152.00 <br />o <br />O o0 <br />O I <br />O O <br />o o <br />c' o <br />LnI� <br />W lD <br />o <br />m o0 <br />O' <br />e e <br />N <br />74 m <br />e <br />Ln 0 <br />N r1 <br />o <br />0 0 <br />m O <br />0 <br />O <br />O <br />0 <br />r-i <br />r 1 <br />m <br />' <br />O <br />O <br />o 0 <br />O N <br />O N <br />0 <br />N m <br />N OO <br />o <br />o 0 <br />O O <br />o <br />r-i <br />O <br />M 0 <br />m o <br />o 0 <br />0 0 <br />0 0 <br />0 0 <br />0 0 <br />0 0 <br />0 <br />0 <br />o o <br />O M <br />O .11 <br />o <br />O,r <br />O 7,1 <br />0 0 <br />0 0 <br />O O <br />0 <br />0 0 <br />O O <br />C <br />iC <br />1,200.00 <br />800.00 <br />150.00 <br />100.00 <br />O O <br />4 O <br />lN0 <br />ri <br />15,860.00 <br />177.00 <br />O lf01 <br />I� <br />MMn <br />,NM <br />N r-I <br />0 0 <br />O 61lD <br />40.00 <br />37,485.00 <br />, O <br />g <br />Ln <br />32,144.00 <br />1,875.00 <br />, Ln <br />p <br />41,895.00 <br />17,567.40 <br />16,938.32 <br />79,441.23 <br />O o <br />O O <br />,N,. <br />g N <br />LO <br />r <br />Lfj <br />N O <br />o On <br />Ln <br />5,625.00 <br />8,000.00 <br />1,875.00 <br />3,550.00 <br />O <br />O <br />O <br />N <br />1,575.00 <br />48,600.00 <br />2,850.00 <br />1,208.00 <br />10,400.00 <br />9,000.00 <br />20,000.00 <br />7,326.00 <br />Work Completed and <br />Materials Stored to <br />Date <br />(H + I) <br />($) <br />Materials <br />Currently Stored <br />(not in G) <br />($) <br />1,200.00 <br />800.00 <br />0 0 <br />O O <br />0 0 <br />Ln O <br />c-I <br />0 0 <br />O N <br />o <br />N <br />lD <br />ri <br />15,860.00 <br />177.00 <br />2,337.00 <br />1,735.65 <br />270.00 <br />396.00 <br />40.00 <br />37,485.00 <br />5,000.00 <br />32,144.00 <br />0 <br />O,, <br />�i <br />I� <br />00�N400 <br />ri <br />,n <br />ts <br />o <br />NooLn <br />41,895.00 <br />17,567.40 <br />16,938.32 <br />79,441.23 <br />p o <br />p 0' <br />0 0 <br />C N <br />00 <br />p <br />.-i <br />�j <br />�fl <br />5,606.25 <br />85.00 <br />5,625.00 <br />8,000.00 <br />o 0 <br />O O <br />0 <br />Lnc-I <br />orLn <br />r-I M. <br />0 <br />O, <br />g <br />N <br />1,575.00 <br />48,600.00 <br />2,850.00 <br />1,208.00 <br />10,400.00 <br />9,000.00 <br />20,000.00 <br />7,326.00 <br />G I H <br />Work Completed <br />Value of Work <br />Completed to Date <br />(E X G) <br />($) <br />Estimated <br />Quantity <br />Incorporated in <br />the Work <br />O O <br />lD l0 <br />r1 <br />o o <br />cri <br />203.00 <br />20.00 <br />6,344.00 <br />59.00 <br />O Ln <br />O Ln <br />Ol 00 <br />Ln <br />O O <br />O O <br />O N <br />rnrm1 <br />8.00 <br />2,205.00 <br />O <br />r-I <br />O <br />W <br />O <br />On <br />N„ <br />O <br />Ln <br />o <br />N <br />p L4 <br />Lfl r I <br />rn ',Y.,'N <br />,vj <br />ri <br />146.02 <br />1,185.69 <br />O p <br />O (Yj <br />r-I <br />O <br />M <br />O O <br />O1 cI <br />O O <br />M <br />O O <br />O <br />M <br />O O <br />c I 00 <br />O O <br />mOLn <br />O <br />O <br />Mr-Ol <br />O O <br />ci - <br />1,200.00 <br />450.00 <br />150.00 <br />100.00 <br />O O <br />O p <br />N <br />Q1 <br />r-I <br />15,350.00 <br />180.00 <br />O O <br />O O <br />Ln I� <br />L. O <br />r-I N <br />360.00 <br />360.00 <br />50.00 <br />37,485.00 <br />O O <br />.� 0 <br />O <br />O <br />Ln <br />O O <br />0 r-i <br />o0 <br />OO <br />00 <br />N <br />O O <br />p,i <br />O <br />O <br />m <br />O T <br />r I o <br />N <br />41,895.00 <br />14,440.00 <br />O O <br />0 0 <br />N M <br />a? r-I <br />M M <br />. Ol <br />86,180.00 <br />2,250.00 <br />862.50 <br />54,723.00 <br />4,225.00 <br />85.00 <br />5,625.00 <br />8,000.00 <br />1,875.00 <br />3,550.00 <br />O O <br />O O <br />O O <br />2 Ln <br />(. Ol• <br />1,575.00 <br />43,200.00 <br />O O <br />O lD <br />Ln Ln <br />00 O <br />N , <br />10,400.00 <br />9,000.00 <br />20,000.00 <br />7,326.00 <br />C I D I E I F <br />Contract Information <br />Value of Bid Item <br />(C X E) <br />($) <br />200.00 <br />50.00 <br />O O <br />O O <br />O O <br />Ln Ln <br />O r-I <br />O O <br />00 O <br />0 0 <br />Ln O <br />N M <br />0 0 <br />O O <br />M M <br />0 0 <br />o 0 <br />M M <br />0 0 <br />0 0 <br />Ln <br />rI <br />r-I p <br />0 <br />0 0 <br />O <br />Ln <br />O r� <br />0 0 <br />00 0 <br />p r-I <br />0 0 <br />0 0 <br />Ln <br />r-I r-I <br />0 0 <br />0 o <br />O O <br />0 0 <br />M LD <br />n <br />O O <br />0 0 <br />4 I� <br />� l0 <br />O O <br />0 0 <br />N O <br />l0 Ln <br />O O <br />Ln Ln <br />n Ln <br />Ln Ln <br />Ln O <br />N O <br />r-I Ln <br />DO a0 <br />1,875.00 <br />2,000.00 <br />1,875.00 <br />3,550.00 <br />700.00 <br />500.00 <br />1,575.00 <br />2,700.00 <br />O O <br />O O <br />Ln 00 <br />O1 <br />800.00 <br />1,000.00 <br />20,000.00 <br />407.00 <br />Unit Price <br />($) <br />2 2 <br />U U <br />a a <br />LJJ LJJ <br />2 2 <br />U U}} <br />a a <br />L1J L1J <br />L.L_ L.L_ <br />z z <br />J J <br />L.L_ L.L_ <br />z z <br />J J <br />L.L_ <br />z ci <br />J (n <br />cid <br />(n Ln <br />cf <br />En U <br />CU YD <br />LUMP SUM <br />} z <br />o <br />U H <br />m z},} <br />0 0>> <br />2 H <br />U U <br />z <br />c7 0 <br />(n H <br />z z <br />0 0 <br />H H <br />2 <br />z U <br />o a <br />H W <br />L.L_ L.L_ <br />z z <br />J J <br />L.L_ 2 <br />U <br />z a <br />J L1J <br />2 2 <br />U U <br />a a <br />W W <br />2 2 <br />V U <br />a a <br />W W <br />2 2 <br />U U <br />a a <br />W LJJ <br />2 2 <br />U U <br />a a <br />LJJ LJJ <br />LIN FT <br />POUND <br />2 2 <br />U U <br />a a <br />W W <br />2 L,L_ <br />U <br />a <br />W <br />N <br />a-+ <br />. <br />Item Quantity <br />O O <br />O O <br />Lc; O1 <br />O O <br />O O <br />Cr; N <br />240.00 <br />30.00 <br />.. <br />0000 <br />O O <br />r' <br />l0 <br />O O <br />LO O <br />LflOD <br />00.OZT <br />00.OZT <br />O O <br />O 8 <br />o Ln <br />' p <br />N <br />O p <br />O p <br />O r-I <br />O <br />3,610.00 <br />150.00 <br />20.00 <br />400.00 <br />150.00 <br />2,065.00 <br />13,965.00 <br />190.00 <br />O O <br />O 8 <br />O o <br />rNi M <br />. <br />O p <br />8 p <br />o cvj <br />0M <br />ri <br />p O <br />O 0 <br />Ln l: i <br />'0�0n <br />O O <br />0 0 <br />N r-I <br />O O <br />0 0 <br />M 4 <br />O O <br />0 0 <br />r-I r-I <br />O O <br />0 0 <br />M al <br />r-1 <br />O O <br />0 0 <br />-I l0 <br />r-1 <br />30.00 <br />132.00 <br />O O <br />O O <br />M Q1 <br />O O <br />O O <br />r-I r0 <br />REMOVE CATCH BASIN <br />REMOVE CASTING <br />SALVAGE GATE VALVE & BOX <br />REMOVE GATE VALVE & BOX <br />REMOVE PIPE SEWERS (STORM) <br />REMOVE WATER MAIN <br />REMOVE CURB AND GUTTER <br />SAWING CONCRETE PAVEMENT (FULL DEPTH) <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />REMOVE BITUMINOUS PAVEMENT (DRIVEWAY) <br />REMOVE CONCRETE WALK <br />REMOVE CONCRETE PAVEMENT <br />SALVAGE LANDSCAPE ROCK <br />COMMON EXCAVATION (EV) (P) <br />SUBGRADE EXCAVATION (EV) <br />DEWATERING <br />HAUL & STOCKPILE RECLAIM MATERIAL (LV) (P) <br />GRANULAR BORROW <br />STREET SWEEPER (WITH PICKUP BROOM) <br />AGGREGATE BASE CLASS 5 MODIFIED (TRAIL) <br />AGGREGATE BASE (CV) FROM STOCKPILE (DRIVEWAYS) <br />AGGREGATE BASE (CV) FROM STOCKPILE (ROADWAY) <br />FULL DEPTH RECLAMATION (9") (P) <br />TYPE 9.5 WEARING COURSE MIX (3,C) (TRAIL) <br />TYPE 9.5 WEARING COURSE MIX (3,C) (DRIVEWAY) <br />TYPE 9.5 WEARING COURSE MIX (3,C) (ROADWAY) <br />TYPE 12.5 NON WEARING COURSE MIX (3,C) (ROADWAY) <br />CONCRETE FLUME <br />12" RC PIPE SEWER DESIGN 3006 CLASS III <br />15" RC PIPE SEWER DESIGN 3006 CLASS III <br />27" RC PIPE SEWER DESIGN 3006 CLASS III <br />15" PIPE PLUG <br />CONNECT TO EXISTING STORM SEWER <br />CONNECT TO EXISTING WATER MAIN <br />8" GATE VALVE & BOX <br />12" GATE VALVE & BOX <br />INSTALL GATE VALVE & BOX <br />ADJUST VALVE & BOX <br />RELOCATE HYDRANT & VALVE <br />REPAIR WATER SERVICE <br />6" WATERMAIN DUCTILE IRON CL 53 <br />WATERMAIN FITTINGS <br />CASTING ASSEMBLY (STORM) <br />CASTING ASSEMBLY (SANITARY) <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN SPEC 2 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 <br />B <br />Description <br />E <br />N <br />Q 1 cC <br />Z <br />m <br />N M <br />Ln <br />o N <br />OO O <br />O 71 <br />rN rMI <br />rn <br />0 IZ <br />0cI0 rnI <br />O NI <br />N MN <br />N N <br />lN0 I- <br />N N1 <br />MO rM <br />N MM <br />A LnM <br />-cf.,) cr., <br />0M0 Ml <br />O r <br />N M <br />4- n <br />0 4 <br />r-I <br />