Laserfiche WebLink
Owner: City of Ramsey Owner's Project No.: CP# 21-00; 21-07 <br />Engineer: Bolton & Menk, Inc. Engineer's Project No.: 0R1.124017 <br />Contractor: Kuechle Underground, Inc. Contractor's Project No.: <br />Project: Riverdale Drive Improvements Agency's Project No.: SAP 199-108-004; 199-010-013 <br />Contract: <br />Application No.: 4 Application Period: From 07/02/21 to 07/30/21 Application Date: 08/05/21 <br />L <br />Balance to Finish (F - J) <br />($) <br />Change Orders <br />SA1 (MOBILIZATION I 1.00 I LUMP SUM I 12,000.00 I 12,000.00I 1.001 12,000.00 I I 12,000.001 100%I <br />O <br />,,. <br />i ON <br />00 <br />� <br />j. <br />i i <br />i i <br />i i <br />i 00 <br />L.f1 <br />N <br />N <br />i 8 <br />N <br />vl Op <br />N <br />, -I <br />N I; <br />ri m <br />m I <br />- <br />1,318.20 <br />1,566.00 <br />1,290.00 <br />2,910.00 <br />i i <br />i i <br />Change Order Totals' $ 82,109.48 I I $ 73,006.73 I $ - I $ 73,006.73 I 89%I $ 9,102.75 <br />Original Contract and Change Orders <br />Project Totals' $ 854,022.61 I I $ 829,660.78 I $ - I $ 829,660.78 I 97%I $ 24,361.83 <br />e e <br />O r-i <br />O O <br />o o <br />O N <br />O 61 <br />e <br />0 0 <br />O O <br />o 0 <br />0 0 <br />O O <br />0 0 <br />0 0 <br />O O <br />0 <br />0 <br />O <br />0 0 <br />O O <br />O O' <br />o0 <br />O Lf, <br />e <br />, <br />m <br />e e <br />d-, <br />00 00 <br />C <br />iC <br />1,045.00 <br />511.00 <br />3,200.00 <br />4,149.20 <br />832.00 <br />700.00 <br />OOlD <br />N <br />gLn <br />l4 N <br />2,900.00 <br />3,500.00 <br />O <br />N <br />1,422.48 <br />8,476.00 <br />r-I O <br />m g <br />m -, <br />N <br />rn <br />Ln <br />6,880.00 <br />15,520.00 <br />J <br />Work Completed and <br />Materials Stored to <br />Date <br />(H + I) <br />($) <br />I <br />Materials <br />Currently Stored <br />(not in G) <br />($) <br />1,045.00 <br />511.00 <br />3,200.00 <br />4,149.20 <br />832.00 <br />700.00 <br />g O <br />l0 N <br />2,900.00 <br />3,500.00 <br />g <br />N <br />1,422.48 <br />8,476.00 <br />`Fp <br />331.25 <br />160.50 <br />N <br />6,880.00 <br />15,520.00 <br />G I H <br />Work Completed <br />Value of Work <br />Completed to Date <br />(E X G) <br />($) <br />Estimated <br />Quantity <br />Incorporated in <br />the Work <br />95.00 <br />146.00 <br />160.00 <br />451.00 <br />O O <br />kO 4 <br />-I <br />1,740.00 <br />120.00 <br />O O <br />� � <br />O <br />' <br />� <br />O O <br />lD <br />N <br />O <br />' <br />O <br />c') <br />N 0 <br />O O <br />456.00 <br />O O <br />0 0 <br />1,045.00 <br />507.50 <br />gr-I <br />m N <br />832.00 <br />700.00 <br />6,090.00 <br />2,520.00 <br />2,900.00 <br />3,500.00 <br />2,100.00 <br />2,250.00 <br />1,422.48 <br />8,450.00 <br />131.75 <br />1,265.00 <br />662.50 <br />294.25 <br />00.99n <br />00'116'1 <br />8,170.00 <br />18,430.00 <br />C I D I E I F <br />Contract Information <br />Value of Bid Item <br />(C X E) <br />($) <br />O O <br />O Lr1 <br />ri M <br />O O <br />0 N <br />0 Q1 <br />N <br />O O <br />O O <br />N 0 <br />�n <br />O O <br />Lr1 0 <br />m <br />N <br />2,900.00 <br />3,500.00 <br />O, <br />O, <br />O M <br />fV <br />355.62 <br />26.00 <br />L!I 0 <br />00 m <br />O N, <br />0 Lf1 <br />O m <br />LAr-i <br />m <br />, <br />O O <br />m R <br />00 <br />430.00 <br />970.00 <br />Unit Price <br />($) <br />H H <br />z z>>> <br />J J <br />O O <br />UUU <br />OI <br />o <br />2 <br />H <br />c7 z <br />VIM <br />LUMP SUM <br />AM BY <br />LUMP SUM <br />LIN FT <br />OC 0 <br />O D <br />2 U <br />POUND <br />SQ YD <br />ACRE <br />POUND <br />POUND <br />LIN FT <br />Q Q <br />w w <br />N <br />a-+ <br />,� <br />Item Quantity <br />95.00 <br />145.00 <br />160.00 <br />235.00 <br />0 0 <br />8 0 <br />r. <br />ri <br />0 0 <br />rI rI <br />0 o <br />cI g <br />4.00 <br />325.00 <br />155.00 <br />550.00 <br />2 0 <br />Q LA <br />1,470.00 <br />180.00 <br />0 0 <br />Ql Ql <br />REMOVE PIPE CULVERTS <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />COMMON EXCAVATION (EV) (P) <br />HAUL & STOCKPILE RECLAIM MATERIAL <br />AGGREGATE SURFACING (CV) CLASS 5 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />FULL DEPTH RECLAMATION (6") (P) <br />PORTABLE PRECAST CONCRETE BARRIER DES 8337 <br />TRAFFIC CONTROL <br />TEMPORARY IMPACT ATTENUATOR <br />STABILIZED CONSTRUCTION EXIT <br />SEDITMENT CONTROL LOG TYPE COMPOST <br />SEDIMENT REMOVAL VAC TRUCK <br />COMMON TOPSOIL BORROW <br />FERTILIZER TYPE 3 <br />EROSION CONTROL BLANKETS CATEGORY 3N <br />SEEDING <br />SEEDING MIXTURE 25-121 <br />HYDRAULIC BONDED FIBER MATRIX <br />4" SOLID LINE MULTI COMP <br />REMOVE VALVE BOX <br />VALVE BOX <br />B <br />Description <br />E <br />Q 1 C <br />z <br />m <br />Q Q <br />L�L�L�L�L�L���L�L�L�L�(.1)L�L�L�L��,L� <br />Q Q <br />Q Q <br />co cy, <br />Q Q <br />O, r-I <br />VC, a <br />r-I r-I <br />a VC, <br />-,-I r-I <br />a a <br />l0 c�-I <br />a <br />W <br />VC, a <br />ON N <br />a a <br />N NI <br />a a <br />