My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/12/2021
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2021
>
Agenda - Council Work Session - 10/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:15:13 PM
Creation date
10/8/2021 9:35:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/12/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 11, 2021 <br />Page 34 <br />Table 4: Feasibility Assessment of Possible Improvements to M <br />Range of <br />Possible Improvements <br />NO BUILD <br />Improves traffic flow <br />across Mississippi <br />River <br />Consistent with local <br />regional planning <br />x <br />Potential residential <br />& community <br />impacts <br />■ 11 <br />Natural <br />resources impact <br />considerations <br />. 11 <br />Eligible for inclusio <br />in Concept <br />Development <br />Do nothing <br />n-- <br />171-- <br />0 <br />ei <br />1 <br />1- <br />0 <br />1 <br />1— <br />I VI a VA 1 Eir! <br />USTH 10Al* <br />USTH 10 A2* <br />USTH 10 B** <br />TH 101 Al <br />TH101A2 <br />TH 610 A*** <br />TH 610 B <br />USTH 169 A*** <br />USTH 169 B*** <br />A <br />B1 <br />B2 <br />Cc <br />Ramsey to Elk River - Spot <br />mobility improvements from <br />Armstrong Blvd (Ramsey) to TH <br />101 (Elk River) I (6 miles) <br />Ramsey to Elk River - Convert to <br />4-lane grade -separated corridor <br />from Armstrong Blvd (Ramsey) to <br />TH 101 (Elk River) I (6 miles) <br />Coon Rapids Lane Add - Add lane <br />from Hanson Blvd to Round Lake <br />Blvd (2.5 miles) <br />TH 101 SB Capacity <br />Improvements - Signals remain. <br />Ideas include adding an additional <br />right turn lane dedicated to WB <br />1-94 or 1-94 interchange could be <br />converted to a DDI <br />SB 101194 System Interchange <br />Improvements - Introduce a <br />southbound TH 101 to eastbound <br />1-94 flyover <br />TH 610 Mobility Improvement - <br />Frorn TH 169 to TH 252 (4 miles) <br />TH 610 East River Rd Interchange <br />- Reconfigure interchange to <br />provide full movements (today <br />ramps only on west side) <br />USTH 169 Mobility Improvement <br />- 1d01st to W. River Road (3 miles) <br />USTH 169 Mobility Improvement <br />- West River Road to TH 10 (,5 <br />miles) <br />x <br />x <br />Zanxi bar/Armstrong Alignment <br />TH 169 to Ramsey Blvd <br />Alignment <br />TH 169 to Sunfish (Lake Bind <br />Alignment <br />TH 169 to 117th Ave to Round <br />Lake Blvd Alignment <br />TH 252 Extension to Hanson Blvd <br />Alignment <br />Je- <br />x <br />x <br />X <br />X <br />e 0 <br />1 <br />❑ L <br />■ L <br />� 11 <br />. 11 <br />. 11 <br />. 11 <br />0 <br />O <br />0 <br />Northwest Metro Mississippi River Crossing Feasibility Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.