My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/12/2021
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2021
>
Agenda - Council Work Session - 10/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:15:13 PM
Creation date
10/8/2021 9:35:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/12/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 11, 2021 <br />Page 48 <br />Concept 4: 4-Lane Expressway River Crossing <br />Concept 4 is the second of two concepts involving a new Mississippi River crossing on the <br />Zanzibar/Armstrong alignment. Concept 4 consists of a four -lane rural divided expressway with a <br />160-foot right-of-way and a minimum one-half mile spacing between at -grade intersections. The <br />concept assumes a 55-mph design speed and a 560-foot bridge span. <br />Figure 29: Concept 4 - Four -lane Arterial Following Zanzibar/Armstrong Alignment <br />Table 9: Concept 4 Improvement Details and Cost Range <br />Improvement <br />Segment <br />Total Project Cost <br />(2030 dollars) <br />New River Crossing <br />Net Cost <br />New river crossing designed as a 4-lane expressway <br />between 1-94 to Highway 10 <br />$190M - $250M <br />$190 - $ 250M <br />Northwest Metro Mississippi River Crossing Feasibility Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.