My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/12/2021
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2021
>
Agenda - Council Work Session - 10/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:15:13 PM
Creation date
10/8/2021 9:35:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/12/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 11, 2021 <br />Page 54 <br />2040 Build Scenario: Concept 3 <br />Concept 3 introduces a new Mississippi River crossing connecting the existing Armstrong <br />Boulevard/Highway 10 interchange north of the river to the Dayton Parkway/I-94 interchange <br />south of the river. The new facility is assumed to be a four -lane divided arterial roadway with a <br />speed limit of 45-mph. <br />Year 2040 traffic forecasts under Concept 3 show an additional 25,000 vehicles using a new arterial <br />Mississippi River crossing between the existing Highway 101 and Highway 169 crossings. This shift <br />in traffic draws 8,000 vpd from the Highway 101 crossing and 10,000 vpd from the Highway 169 <br />crossing. <br />Figure 33: Concept 3 Impacts on Regional Traffic Volumes <br />Legend <br />Vofume increases <br />compared to No Build <br />Volume decreases <br />compared to No Build <br />Northwest Metro Mississippi River Crossing Feasibility Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.