Laserfiche WebLink
September 11, 2021 <br />Page 79 <br />Figure 53: Hwy 10/Armstrong Boulevard Intersection Delay; AM Peak Hour - Improved Geometry <br />Existing Conditions MI 9 6 <br />2040 No Build - Traditional <br />2040 Concept 3 - Traditional <br />2040 Concept 4 - Traditional <br />0 <br />• Bunker Lake Blvd <br />TH 10 WB Ramp <br />1TH10EBRamp <br />310L 2111 <br />50 100 15O 200 250 300 <br />Intersection Delay (sec) <br />Figure 54: Hwy 10/Armstrong Boulevard Intersection Delay; PM Peak Hour - Improved Geometry <br />Existing Conditions <br />2040 No Build - Traditional <br />2040 Concept 3 - Traditional <br />2040 Concept 4 - Traditional <br />12 8 <br />16 24 <br />4=36 <br />MEIFIEML!!...M <br />50 <br />100 <br />150 200 <br />Intersection Delay (sec) <br />• Bunker Lake BIv: <br />'NTH 10WBRamp <br />• TH 10 EB Ramp <br />250 <br />300 <br />Northwest Metro Mississippi River Crossing Feasibility Analysis <br />