My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/12/2021
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2021
>
Agenda - Council Work Session - 10/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:15:13 PM
Creation date
10/8/2021 9:35:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/12/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 11, 2021 <br />Page 80 <br />Intersection Delay Sensitivity Test <br />Peak hour operational analysis was also conducted for the Highway 10/Armstrong Boulevard <br />interchange using forecasts assuming increased telecommuting. The same methodology was used to <br />calculate intersection delay under the telecommute forecast as under the forecast with traditional <br />travel behavior assumptions. <br />AM peak hour intersection delay with increased telecommuting and existing geometry is shown in <br />Figure 55. PM peak hour intersection delay with increased telecommuting and existing geometry is <br />shown in Figure 56. These figures show that the Highway 10/Armstrong Boulevard interchange will <br />operate below 2040 no -build conditions if a new river crossing is built, but with significantly less <br />delay under forecasts with increased telecommuting than under forecasts with traditional travel <br />behavior assumptions. This is especially true during the AM peak hour, at which time intersection <br />delay under the telecommute build scenario is half the delay under the traditional build scenario. <br />Figure 55: Hwy 10/Armstrong Blvd Intersection Delay with Increased Telecommuting; AM Peak Hour - <br />Existing Geometry <br />Existing Conditions M 9 6 <br />2040 No Build - Traditional 30 12 41 <br />2040 Concept 3 - Traditiona I 48 56 <br />2040 Concept 4 - Traditional 49 84 <br />2040 No Build - Telecommute 26 12 27 <br />2040 Concept 3/4 - Telecommute 37 44 58 <br />■ Bunker Lake Blvd <br />■ TH 10 WB Ramp <br />■ TH 10EB Ramp <br />113 <br />151 <br />Intersection Delay (sec) <br />2 50 300 <br />Figure 56: Hwy 10/Armstrong Blvd Intersection Delay with Increased Telecommuting; PM Peak Hour - <br />Existing Geometry <br />Existing Conditions _ 12 8 <br />2040 No Build - Traditional <br />2040 Concept 3 - Traditional <br />2040 Concept 4 - Traditional <br />2040 No Build - Telecommute <br />2040 Concept 3/4 - Telecommute <br />17 33 <br />■ Bunker Lake Blvd <br />■ TH 1OWB Ramp <br />■ TH 10 EB Ramp <br />70 121-1116-111 <br />is <br />28 <br />50 100 150 200 250 300 <br />Intersection Delay► (sec) <br />Northwest Metro Mississippi River Crossing Feasibility Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.