Laserfiche WebLink
Future (2030) congestion with a no build scenario was expected to be significantly above capacity for <br />much of the study area in the vicinity of the I-94/TH 101 interchange. See Figure 5. <br />Figure 5: 2030 Congestion for NW Hennepin Area Roadways <br />2030 Congestion - No Build <br />Northwest Hennepin County <br />1-94 Sub -Area Transportation Study <br />Figure 4-3 <br />Congested Segments <br />I� [VAC > 1,0 (L S E)] <br />Interchange <br />.--. Overpass <br />2 <br />t I <br />I1iI s <br />Hennepin County has planned for a future arterial roadway system in the feasibility study that will <br />include better access to I-94, new interchanges, and an arterial roadway network within Dayton <br />including a north -south access along Zanzibar Lane linking to Dayton River Road (CH 12). See Figure 6. <br />NW Metro Mississippi River Crossings Feasibility Analysis <br />Page 111 <br />