My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/12/2021
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2021
>
Agenda - Council Work Session - 10/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:15:13 PM
Creation date
10/8/2021 9:35:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/12/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 9: Met Council Strategic Capacity Enhancements, 2020-2025 <br />Wright <br />Reference ttems <br />Principal Arterials <br />•' , -Minor Arterials <br />CDCounty Boundary <br />• Regional Solicitation Roadway Expansion Project <br />• Other Regionally Significant Expansion Projec <br />P n <br />'noo ke- <br />111 <br />The strategic capacity enhancements shown in Figure 6 include: <br />• Brockton Lane (CSAH 13) interchange with 1-94 (Dayton) <br />• 1-94 lane widening between Brockton Lane and TH 101 (Rogers) <br />• New underpass for US 10 at Fairoak Ave and interchange at Thurston Ave (Anoka) <br />• New interchange for US-169 at 1015t Ave N (Brooklyn Park) <br />• Four new interchanges on US-169 from US-10 to 198th Ave N (Elk River) <br />• Interchange reconstruction and auxiliary lanes at US-10 and US-169 (Anoka) <br />The TPP also notes a series of unfunded projects that have merit but are currently unfunded, including <br />additional traffic management technology priorities for several study area roads and construction of a <br />future MnPASS project for 1-94 south of TH 101 (a Tier 3 MnPASS priority project). <br />Progress <br />Several elements of the strategic capacity enhancement program described above are currently in <br />progress. <br />Key Takeaways <br />• Significant investment currently focused primarily on principal arterials for the feasibility <br />analysis area <br />• US-10 corridor has strategic capacity enhancements planned and funding secured or in process. <br />• 1-94 improvements at Brockton Lane and on 1-94 in Dayton/Rogers will address longstanding <br />issues with local network resilience and bottlenecking. <br />• Document does not feature river crossing but does recommend continued cooperation between <br />counties and MnDOT to monitor the need for a bridge over the Mississippi, and that project <br />partners work together to preserve right-of-way. <br />NW Metro Mississippi River Crossings Feasibility Analysis <br />Page 118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.