Laserfiche WebLink
TOURS/MEETINGS <br /> <br />* A calendar of the training room schedule through April 5, 2002 was handed out. <br /> <br />GRILL UPDATE <br /> <br />~ Ofricer Lemm reviewed the cost of the grill. <br /> <br />MONTHLY REPORTS <br /> <br />A SSIS T/I N T CHIEF <br /> <br />,, The audit found Station #1 acceptable. <br /> <br />,~ The manual release on garage door #2 does not work. <br /> <br />CAPTAIN #1 l <br /> <br /> Ail fuel levels were good. <br /> <br /> Tanker #1 drains were opened and dirty. <br /> <br /> Engine #1 had a light repaired. <br /> <br /> Nozzles are inventoried and new ones ordered. <br /> <br /> Emergency Apparatus completed annual maintenance. <br /> <br />o Tanker #1 had new brakes installed and Engine #1 needs brakes. <br />The grass trucks arein service. <br /> <br /> Officer Lewandowski and Firefighter Block helped Officer Weiss test and mark the hose and <br /> it Js hanging in the hose tower. <br /> <br />~ A butterfly valve is needed on Tanker #2. <br /> <br />CAPTAIN #12 <br /> <br /> Firetighter Dahlberg's turnout coat is in for new pockets. <br /> <br /> Firefighter Noreen's turnout pants are in for repair and new gloves have been purchased for <br /> him. <br /> <br /> Officer Lemm is looking into purchasing fireproof thread so Canvas Craft can start making <br /> necessary repairs to the turnout gear. <br /> <br /> FIRE DEPARTMENT OFFICERS/FEBRUARY 5, 2002 <br /> Page 3 of 5 <br /> <br /> <br />