Laserfiche WebLink
with street crossing culverts connecting the ditches. Storm water is generally carried south towards Trott Brook. <br />Staff is unaware of drainage issues or concerns with the existing drainage swales which would require re -grading. <br />Beyond touch up work required due to replacing the street crossing culverts, grade changes to the swales are not <br />proposed, however, this will be reviewed during project design. <br />This project presents two right of way concerns which will be explored during project design. 169th Avenue west of <br />Rabbit Street terminates without a turn -around. This street segment is 640 lineal feet long, 24-feet wide, and <br />currently lacks enough right of way to build a cul-de-sac or hammer head turn -around. 168th Avenue terminates in <br />a 66 foot diameter cul-de-sac. This cul-de-sac sits within the existing right-of-way, but is below the City standard <br />100 foot diameter. In both cases any improvements would require additional right of way. Staff is proposing to <br />bring improvement options to a future Public Works Committee meeting for discussion, once impacts can be <br />explored during project design. <br />Estimated project costs per the proposed 2022 — 2031 CIP are $984,000. Estimated costs include 23-percent <br />indirect costs for administrative, engineering, finance and legal costs. Staff proposes to create the plans and <br />specifications in-house as part of their normal duties. <br />The street improvements proposed with this project are identified in the City's 10-year CIP, and can be funded <br />using a combination of Pavement Management Funds and Storm Water Utility Funds. This project would best be <br />constructed as a stand-alone project and is necessary, feasible, and cost-effective from an engineering standpoint, <br />and can be constructed as proposed herein. <br />The proposed improvements are designated as City Improvement Project #22-02, Autumn Height Street <br />Reconstructions. <br />Notification: <br />Notifications are not required for this case. <br />Time Frame/Observations/Alternatives: <br />Motion to adopt Resolution #21-300 ordering plans and specifications for improvement project #22-02, Autumn <br />Heights Street Reconstructions. <br />Funding Source: <br />Funding for this improvement is proposed to come from the Pavement Management Fund and Storm Water Utility <br />Fund. <br />• (PMP) Street Project Cost $895,000 <br />• Storm Sewer Project Cost $89,000 <br />• Total Estimated Project Cost $984,000 <br />Recommendation: <br />Staff recommends adopting Resolution #21-300 ordering plans and specifications for improvement project #22-02, <br />Autumn Heights Street Reconstruction. <br />The Ramsey Public Works Committee reviewed this project on October 19, 2021. The committee recommended <br />City Council authorization ordering Staff to prepare plans and specifications. <br />Outcome/Action: <br />Adopt Resolution #21-300, ordering plans and specifications for improvement project #22-02, Autumn Heights <br />Street Reconstruction. <br />Attachments <br />