My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/26/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 10/26/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:15:39 PM
Creation date
1/11/2022 3:29:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/26/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
may not become apparent until additional exploration work is completed or construction is <br />conducted. A reevaluation of the recommendations in this report should be made after <br />performing on -site observations during construction to note the characteristics of any variations. <br />The variations may result in additional foundation costs and it is suggested that a contingency be <br />provided for this purpose. <br />It is recommended that we be retained to perform the observation and testing program during <br />construction to evaluate whether the design is as expected, if any design changes have affected <br />the validity of our recommendations, and if our recommendations have been correctly interpreted <br />and implemented in the designs, specifications and construction methods. This will allow <br />correlation of the soil conditions encountered during construction to the soil borings and will <br />provide continuity of professional responsibility. <br />7.2 Review of Design <br />This report is based on the design of the proposed structure as related to us for preparation of this <br />report. It is recommended that we be retained to review the geotechnical aspects of the design <br />and specifications. With the review we will evaluate whether any changes have affected the <br />validity of the recommendations and whether our recommendations have been correctly <br />interpreted and implemented in the design and specifications. <br />7.3 Groundwater Fluctuations <br />We made water level measurements in the borings at the times and under the conditions stated <br />on the boring logs. The data was interpreted in the text of this report. The period of observation <br />was relatively short and fluctuations in the groundwater level may occur due to rainfall, flooding, <br />irrigation, spring thaw, drainage, and other seasonal and annual factors not evident at the time <br />the observations were made. Design drawings and specifications and construction planning <br />should recognize the possibility of fluctuations. <br />7.4 Use of Report <br />This report is for the exclusive use of City of Ramsey and their design team to use to design the <br />proposed structure and prepare construction documents. In the absence of our written approval, <br />we make no representation and assume no responsibility to other parties regarding this report. <br />The data, analysis and recommendations may not be appropriate for other structures or purposes. <br />We recommend that parties contemplating other structures or purposes contact us. <br />7.5 Level of Care <br />Haugo GeoTechnical Services, LLC has used the degree of skill and care ordinarily exercised <br />under similar circumstance by members of the profession currently practicing in this locality. No <br />warranty expressed or implied is made. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.