Laserfiche WebLink
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />October 21, 2021 <br />Mr. Bruce Westby, P.E. <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />RE: Proposal for Engineering Services - Riverdale Drive Improvement Project <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />Dear Mr. Westby: <br />We appreciate the opportunity to present this scope of services for the Riverdale Drive Improvement <br />project. Our scope and fees were prepared based on our understanding of the project and our previous <br />experience in delivering Municipal Agreement and State Aid projects. <br />SCOPE <br />The City is anticipating construction of the improvements in two phases, with the public utility portion of <br />the project being completed prior to the roadway related improvements. This is due to the length of time <br />required to obtain MnDOT approvals associated with Local Partnership Program (LPP) funding. The <br />proposed improvements will be generally as described below: <br />• Riverdale Drive construction from Llama Street to Bowers Drive, <br />• Trails, sidewalks, landscaping and lighting improvements (to be determined), <br />• Closure of the median crossing and extension of the eastbound right turn lane at Bowers Drive <br />could be completed to strengthen the funding application. <br />A figure is attached depicting the roadway improvements. <br />Project scope assumptions used in creating this fee proposal include the following: <br />• Local Partnership Program Funding: The following documents will be prepared and submitted <br />in accordance with funding program requirements: Quality Management Process, Transportation <br />Management Plan, electronic as-builts, Historical/Archeological Review Request, and Project <br />Schedule (following MnDOT template). <br />• A topographic survey: Survey will be completed during the Trunk Utility Phase of the project <br />and will be used for roadway design. <br />• Geotechnical: Borings will be completed during the Trunk Utility Phase of the project and will <br />be used for roadway design. <br />• Preliminary Design: Considerations will include the following: <br />o Roadway alignment, <br />o Improvements along TH 10, and <br />o Extent of trail, sidewalk, landscaping, and lighting improvements. <br />Bolton & Menk is an equal opportunity employer. <br />