My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/18/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 01/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:36:13 AM
Creation date
1/19/2022 8:37:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Street and Trail Improvements <br />Sunwood Drive NW <br />The improvements completed in 2004 provided a fully developed concrete roadway adjacent to the <br />undeveloped area located in the northwest area of The COR. The boulevard was designed to allow for <br />future widening and expansion as development and other improvements occur. <br />Center Street NW <br />Improvements to Center Street NW were completed in 2014 and included construction of a 36-foot wide <br />bituminous street with a 10 foot concrete sidewalk, angled parking along the west side, and parallel <br />parking stalls along the east side of the street. <br />The extension of the full Center Street typical section was completed to 100-feet north of 145th Avenue <br />NW. The remaining roadway was then constructed as a temporary street section with bituminous curb and <br />a bituminous trail for a distance of approximately 220-feet to Ramsey Parkway. <br />The alignment of Center Street between Ramsey Parkway and Bunker Lake Boulevard followed the <br />original plat of Ramsey Town Center. This does not match the revised 2012 COR master plan alignment. <br />See Figure 4 in Appendix B. <br />Zeolite Street NW <br />Zeolite Street was constructed as a temporary rural section with bituminous surface in 2005 from <br />Sunwood Drive to Bunker Lake Boulevard. <br />Utilities <br />All past improvements completed within The COR were consistent with the City's Sanitary Sewer and <br />Water System Comprehensive Plans. See Figures 8-10 in Appendix B for the water, sanitary, and storm <br />utility layouts. <br />Sanitary Sewer Improvements <br />In 2004, a 30-inch trunk sanitary sewer was extended along Sunwood Drive to serve The COR. In 2005, <br />15-inch and 18-inch sanitary sewer was installed from Bunker Lake Boulevard to Sunwood Drive. This <br />main was installed in Zeolite Street from Bunker Lake Boulevard to the currently platted Ramsey <br />Parkway alignment (from the Ramsey Town Center layout). This main then follows the un-platted Yoffie <br />Street alignment to Sunwood Drive. <br />The segment of sanitary sewer main that follows the platted Ramsey Parkway does not follow the revised <br />2012 master plan alignment of Ramsey Parkway. This main may need to be realigned when this segment <br />of Ramsey Parkway is constructed. <br />The existing sanitary sewer trunk mains have capacity to provide service to The COR. <br />Water Distribution Improvements <br />The elevated storage for the City of Ramsey is adequate to provide fire flow to The COR. The trunk <br />distribution system was also found to be adequate to serve The COR. <br />Prepared by: Bolton & Menk, Inc. EXISTING IMPROVEMENTS <br />The COR Analysis 1 R16.114924 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.