My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/18/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 01/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:36:13 AM
Creation date
1/19/2022 8:37:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ Extend the existing boulevard layout used east of Sapphire Street NW <br />o Extension of irrigation for planting areas. <br />• Yolite Street - Segment E: (Figures 21 & 28) <br />o Construction of Yolite Street NW from Sunwood Drive to Ramsey Parkway. <br />■ 36-foot roadway with 6-foot sidewalks on both sides <br />o Extension of watermain. <br />o Extension of storm sewer for regional pond outlet. <br />• Zeolite Street - Segment F-1 and F-2: (Figures 22, 23 & 28) <br />o Construction of Zeolite Street NW from Sunwood Drive to Bunker Lake Boulevard. <br />■ 40-foot roadway with 6-foot sidewalks on both sides. <br />o Adjust watermain to proposed grades <br />o Extension of storm sewer for roadway drainage <br />o Extension of sanitary sewer for service to adjacent parcels <br />• Bunker Lake Boulevard - Segment G: (Figures 24 & 29) <br />o Construction of Bunker Lake Boulevard from Armstrong Boulevard to Ramsey Boulevard. <br />■ 4-lane divided roadway with concrete median as depicted in the Anoka County 2030 <br />Transportation Plan <br />o Anoka County State Aid Highway 116 <br />• Veterans Drive - Segment H: (Figures 25 & 28) <br />o Construction of Veterans Drive from Rhinestone Street to Ramsey Boulevard. <br />• 36-foot roadway with 6-foot sidewalks on both sides. <br />o Construct Right--in/Right-out intersection on Ramsey Boulevard. <br />• Subject to Anoka County approval. <br />o Extension of watermain. <br />o Extension of storm sewer for roadway drainage. <br />• Peridot Street - Segment I: (Figures 26 & 28) <br />o Construction of Peridot Street NW from Sunwood Drive to Veterans Drive. <br />• 36-foot roadway with 6-foot sidewalks on both sides. <br />o Extension of sanitary sewer south from Sunwood Drive. <br />o Extension of watermain. <br />o Extension of storm sewer for roadway drainage. <br />Estimated project costs for each segment were developed to allow for the City to plan for the sequenced <br />implementation of the improvements and are summarized later in this report. <br />IX. COST ANALYSIS <br />Costs estimates were developed for each improvement type. These estimates are based on past bid pricing <br />and similar projects completed previously. The segments are depicted on Figure 2 in Appendix B. All <br />costs presented in the following pages are 2018 costs. <br />Prepared by: Bolton & Menk, Inc. <br />The COR Analysis 1 R16.114924 <br />COST ANALYSIS <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.