My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/18/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 01/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:36:13 AM
Creation date
1/19/2022 8:37:47 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Segments D-1, D-2, D-3 and D-4 include trails, sidewalks and miscellaneous street scape improvements <br />along Sunwood Drive. The Segments, and associated costs, are presented in the following table. <br />Segment Location Estimated Cost <br />D-1 Center Street to Sapphire Street $ 113,000 <br />D-2 Xenolith Street to Center Street $ 176,000 <br />D-3 Yolite Street to xenolith Street $ 198,000 <br />D-4 Zeolite Street to Yolite Street $ 204,000 <br />Total $ 691,000 <br />The above costs are considered project costs and include 30% contingencies and project development <br />costs. Project development costs include administrative, engineering, and fiscal related costs. <br />Summary of Costs <br />The total for the roadway, trail, sidewalk, street lighting, lateral sanitary sewer, storm sewer and water <br />main improvements is estimated at $12,445,000. <br />The total trunk related improvements for sanitary sewer and storm sewer is estimated at $285,000. <br />The total landscaping improvements along Sunwood Drive from Zeolite Street to Sapphire Lane is <br />estimated at $691,000. <br />General Cost Estimating Assumptions <br />• Dewatering will be required for sewer and water installation. <br />• Fill will be required for all roadways. <br />• Borrow material cost does not assume use of regional pond excavation. <br />• Aggregate base cost does not assume use of City stockpile. <br />• Costs associated with creating the bioretention basin are included in the roadway portions of <br />Ramsey Parkway (Segments A-1, A-2, A-3, and A-4). <br />Segment A-1 Assumptions <br />• Removal of existing 42-inch storm sewer included in trunk storm sewer cost. <br />• Sanitary sewer is assumed to extend to midpoint of last parcels serviced by sewer line. <br />• Roadway costs include tapering the roadway from a 47 ft wide median to a 20 ft wide median. <br />• Includes an allotment for (2) 6 ft wide sidewalks along the roadway boulevard areas. <br />• Costs for the median include restoration and plantings. <br />Segment A-3 Assumptions <br />• The trunk 18-inch sanitary sewer was assumed to remain in place, outside the future Ramsey <br />Parkway alignment. <br />o If the trunk sanitary sewer main needs to be relocated to provide buildable area in the <br />northwest quadrant of the Ramsey Parkway and Zeolite Street intersection, the relocation <br />is estimated to cost $141,000. <br />• 8-inch sanitary sewer is assumed to extend to midpoint of last parcels serviced by sewer line. <br />Prepared by: Bolton & Menk, Inc. <br />The COR Analysis f R16.114924 <br />COST ANALYSIS <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.