Laserfiche WebLink
/~4E I ) I U/I L/S CBA <br /> <br />Officer Weiss reviewed the Medical/SCBA Report. <br /> <br /> Glove pouches are here, if you do not have one let Officer Weiss know. <br /> <br /> Ten new PALS have been ordered. PALS now come with automatic turn on. <br /> <br /> Mask bags are here, if you do not have one let Officer Weiss know. <br /> <br /> One SCBA bottle on Engine Two was empty. <br /> <br />· [-lydro testing will be done in three groups, so only 1/3 of the bottles will be out of the <br /> Department at a time. It should take about four days. <br /> <br />· The hori×ontal cascade system on Engine Two is within DOT guidelines. Only liquid bottles <br /> and systems need to be vertical. <br /> <br />STATION CI~EANUP <br /> <br />· l;ircfighter Peterson's group has station clean-up this month. <br /> <br />SAFETY CONCERNS <br /> <br />· To improve the air exchange in the fire bay, it was asked if something such as ceiling fans <br /> could bc installed. <br /> <br />· C, urtain air bags for side impact are becoming more common. Next year extrication training <br /> will include side air bags. <br /> <br />· Bc aware of heat exhaustion with summer approaching. Make sure to get refreshment and <br /> Rchab. <br /> <br />· Keep on high alert when doing traffic control. Vests should be worn. <br /> <br />STATION #2 UPDATE <br /> <br />· The ~-ootings are going to be removed because State concrete testing wasn't done. <br /> <br />ENGINE #2 UPDATE <br /> <br /> Adapters have been ordered for Engine Two, they will be the same as Engine One. A strainer <br /> needs to be ordered. <br /> <br />FIRE DEPARTMENT/May 10, 2000 <br /> Page 3 of 5 <br /> <br /> <br />