Laserfiche WebLink
· SCBA Hydro testing has been completed. Paper work has been updated. <br /> <br />· Five new PAL keys have arrived. The accountability officer will have access to the key. <br />STATION CLEANUP <br /> <br />· Firefighter Lecy's group has station clean up this month. <br /> <br />SAFETY CONCERNS <br /> <br />· If at all possible, when at a fire or rescue scene do not park the trucks on the highway. <br /> Tra£fic does not slow down and it is safer for firefighters to exit the truck in less traffic areas. <br /> <br />· Reflective vests will be ordered for incident command officers and pump operators. <br /> <br />· Highway #47 will be closed up to 153~d Avenue for a period of about two weeks. <br /> <br />· The trucks need to be cleaned after calls. <br /> <br />STATION #2 UPDATE <br /> <br />· Support columns have been installed. <br /> <br />· The eye beams have been delivered. <br /> <br />· The roof joists are still scheduled to arrive in September. <br /> <br />ENGINE #2 UPDATE <br /> <br />· Custom will look at the low voltage problem. <br /> <br />NEW FIREFIGHTER INFORMATION SESSION <br /> <br />· The session went well. <br /> <br />· There are six to eight applicants to interview. <br /> <br />DIAMONDS CONCERT MEDICAL COVERAGE <br /> <br />· Six EMT volunteers have signed up for the event. <br /> <br />· Officer Simpson will arrange a schedule with those volunteers. <br /> <br />FIRE DEPARTMENT/August 9, 2000 <br /> Page 3 of 5 <br /> <br /> <br />