My WebLink
|
Help
|
About
|
Sign Out
Home
10/11/00
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Fire Department
>
Minutes
>
2000
>
10/11/00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2025 1:42:08 PM
Creation date
9/9/2005 10:53:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Fire Department
Document Date
10/11/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
· Grass//2 will go to Elk River Ford to have the carburetor adjusted. <br /> <br />· The seats in Engine #1 should be redone before Station #2 is completed. <br /> <br />I;ADIOS/PAGERS/TURNOUT GEAR <br /> <br />()ffi cot Sharp reviewed the Radio's/Pagers/Turnout Gear Report. <br /> <br />· Five pagers are out for repair. <br /> <br />· There has been a delay at the factory with the turnout gear. <br /> <br />· More gloves have been ordered. <br /> <br />· Firefighters Nelson, Termus and Shefveland have been sent for portraits. <br /> <br />· Paperwork has been started for the purchase of six pairs of boots. <br /> <br />· Radios are marked and Officer Sharp is working on a procedure to sign them out. <br /> <br />£~/C]DENT REPORT <br /> <br />No report. <br /> <br />MEDIC/tL/SCBA <br /> <br />Chief Kapler reviewed the Medical/SCBA Report. <br /> <br /> The defibrillator was inspected and the battery changed. <br /> <br />· There were no medical reports filled out last month. There was only one rescue call. <br /> <br />· Bids need to be obtained for a defibrillator unit for Station #2 and the defibrillator should be <br /> consistent with the unit at Station #1. <br /> <br /> The tive PAL keys are located behind the Captain's chair. <br /> <br />· Thc valve for the Cascade System is fixed, however a new valve is needed fOr the portable <br /> cascade. <br /> <br />· A compressor is needed for Station #2. <br /> <br />· A six-inch D handle pike pole has been ordered. <br /> <br />FIRE DEPARTMENT/OCTOBER 11, 2000 <br /> Page 2 of 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.