Laserfiche WebLink
CITY OF RAMSEY <br /> DEVELOPMENT PERMIT <br />SUNFLOWER RIDGE SECOND ADDITION <br /> <br />()n Scptcmber 13, 2005, Site Plan approval was granted by the City of Ramsey ("City) to US <br />t lomc (iorporation ("Permittee") to develop eighty-six (86) townhome units ("Structures") on the <br />property which is legally described as follows: <br /> <br />Part of the East Half of the Southeast Quarter of the Northeast Quarter, Section <br />23, Township 32, Range 25, Anoka County, Minnesota. <br /> <br />the ("Site"). <br /> <br />'l'his approval is issued pursuant to {}9.03.0'8 of the City Codel The conditions of this approval <br />are as IUllows: <br /> <br />I. STRUCTURE. All building plans must be prepared and certified by a registered engineer or <br /> architect. <br /> <br />2. STATE BUILDING CODE COMPLIANCE. The Structures shall be constructed in <br /> accordance with the requirements of the State Building Code. <br /> <br />SITE PLAN COMPLIANCE. The townhomes structures shall be sited and constructed on <br />thc Silo as shown on the Site Plan prepared by Passe Engineering, Inc., dated August 15, <br />2005. <br /> <br />4. SITE PREPARATION. All site grading and drainage shall be subject to approval by the <br /> City Engineer. <br /> <br />REQUIRED IMPROVEMENTS. The Permittee shall construct and install the following <br />site improvements on the Site in accordance with the specifications and location as shown on <br />the Site Plan. The Required Improvements are as follows: <br /> <br /> Installation of bituminous driveways, driveway collectors, parking nodes and <br /> maneuvering areas. <br />b. hmtallation of continuous, surmountable concrete curbing and gutter around the perimeter <br /> of all bituminous surfaces, except residential driveways and trails.' <br />c. Establis. hment of turf in areas disturbed during construction and in accordance with the <br /> Site Plan. <br />d. I,andscaping in accordance with the Landscape and Tree Preservation Plan prepared by <br /> Passe Engineering, Inc., dated August 15, 2005. <br />c. h-rigation metering and backflow devices shall be approved as part of the Utility Plan, and <br /> installed accordingly. <br /> <br />(~'Rcq uircd Improvements). <br /> <br /> <br />