Funding Source: <br />On January 18, 2022 a total of eleven (11) bids were received, opened, and tabulated, and the following bids were <br />found to comply with the advertisement for bids. <br />CONTRACTOR TOTAL BID <br />North Valley, Inc. $ 104,935.73 <br />Goodmanson Construction $ 109,239.00 <br />Omann Brothers Paving Inc. $ 109,991.04 <br />Aslakson's Service Inc. 1$ 113,277.71 <br />Minnesota Roadways Company $ 116,012.95 <br />Asphalt Surface Technologies Corporation $ 116,807.28 <br />Bituminous Roadways Inc. $ 117,400.00 <br />Park Construction Company 1$ 119,3 84.22 <br />Allied Blacktop Company $ 123,844.78 <br />Winberg Companies $ 124,958.22 <br />Urban Companies $ 169,563.50 <br />Engineer's Estimate <br />$ 96,209.00 <br />The bid of North Valley, Inc. of Nowthen, Minnesota, in the amount of $104,935.73 for the total bid for <br />construction of said improvements in accordance with the approved plans and specifications and advertisement for <br />bids, is the lowest responsible bidder. Adding indirect costs in the amount of 14-percent brings total project costs to <br />$119,626.73 . <br />Per the final plans and specifications, estimated construction costs were $96,209.00. After adding 14-percent for <br />indirect costs for administrative, engineering, finance and legal costs, estimated project costs totaled $109,678.26. <br />The low bid is 8-percent more than the engineer's estimate, primarily due to higher than estimated bituminous <br />paving, concrete, and pavement marking costs. <br />The funding source for these improvements is proposed to be taken from the Facility Funds, which has an adequate <br />balance to fund these improvements. <br />City Staff proposes to administer and inspect construction. <br />Plans and specifications were prepared in-house as part of Staff's normal duties. <br />Outside costs incurred to date as engineering indirect costs include: <br />• $100.00 for SPC Engineering & Testing, Inc. to perform pavement coring for determining existing pavement <br />thickness. This cost is included in the 14% indirect project costs. <br />Recommendation: <br />Staff recommends adopting Resolution #22-021 accepting bids and awarding contract for Improvement Project <br />#21-10, Fire Station No.1 Parking Lot Improvements, to North Valley, Inc. for the bid in the amount of <br />$104,935.73. <br />Action: <br />Motion to adopt Resolution #22-021 accepting bids and awarding a contract for Improvement Project #21-10, Fire <br />Station No.1 Parking Lot Improvements, to North Valley, Inc. for the bid in the amount of $104,935.73. <br />Attachments <br />