My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/11/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 01/11/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:14:27 PM
Creation date
1/26/2022 11:02:23 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/11/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br />b. Jurisdictional Authority/Approvals/Permits <br />As the project moves from the planning stages to design and construction, permits will be <br />required from various agencies. The following agencies will be permitting entities for considered <br />improvements: <br />• Minnesota Department of Transportation State Aid: Variolite Street is a State Aid route, <br />• Anoka County: Nowthen Boulevard is a county roadway, <br />• Minnesota Pollution Control Agency: NPDES Storm Water Permit, <br />• Minnesota Pollution Control Agency: Sanitary Sewer Extension Permit, <br />• Minnesota Department of Health (MDH): Watermain Extension, <br />• Minnesota Department of Natural Resources (MNDNR): Dewatering, and <br />• Lower Rum River Watershed Management Organization: Storm Water related. <br />IX. ADDITIONAL IMPROVEMENT CONSIDERATIONS <br />Street Lighting <br />No costs are included in this report for street lighting. <br />Trails/Sidewalks <br />No trails or sidewalks are included in this analysis. <br />Landscaping <br />The improvements considered with this report include a very utilitarian landscaping approach to <br />the area. Features, such as trees, shrubs, decorative features, and monuments are not included in <br />the estimated project costs. <br />Right of Way and Easements <br />We assumed that required rights of way would be dedicated as a portion of the development <br />process, and no costs are included in the project costs for acquisitions. <br />X. COST CONSIDERATIONS <br />The estimated project costs are summarized below. Costs were developed based upon similar <br />types of projects completed previously, with adjustments for inflation. <br />Improvement <br />Hunt <br />Addition <br />Hunt Addition <br />plus % Makowsky <br />Addition <br />Hunt Addition <br />plus Makowsky <br />Addition <br />Road & Storm (173rd Street Perm) <br />$251,000 <br />$251,000 <br />$251,000 <br />Road & Storm (173rd Street Temp) <br />$156,000 <br />$0 <br />$0 <br />Roadway & Storm (County Road) <br />$312,000 <br />$312,000 <br />$312,000 <br />Sanitary Sewer <br />$219,000 <br />$1,250,000 <br />$1,455,000 <br />Lift Station <br />$585,000 <br />$975,000 <br />$975,000 <br />Force main <br />$386,000 <br />$387,000 <br />$387,000 <br />Water System <br />$811,000 <br />$811,000 <br />$811,000 <br />TOTAL <br />$2,720,000 <br />$3,986,000 <br />$4,191,000 <br />Prepared by: Bolton & Menk, Inc. <br />Trott Brook North Infrastructure Study — City of Ramsey <br />
The URL can be used to link to this page
Your browser does not support the video tag.