Laserfiche WebLink
Page 6 <br />The costs shown above are considered project costs and include 30% contingencies and project <br />development costs. Project development costs include administrative, engineering, and fiscal <br />related costs. <br />Future watermain improvements will be required to complete a loop along 175th Avenue. The <br />costs associated with completing the loop are estimated at $745,000. <br />XI. CONCLUSION <br />The information presented in this report is intended to allow for discussions with property owners <br />and developers, as well as allow the City to begin considering funding options. <br />XII. ATTACHMENTS <br />Several attachments are included in the appendix of this report. The attachments are meant to <br />serve as discussion documents related to assumptions made in preparation of the report. <br />Appendix A: Figures <br />Figure 1: Study Area <br />Figure 2: Sanitary Sewer Comprehensive Plan Update <br />Figure 3: Water System Comprehensive Plan Update <br />Figure 4: City Zoning Map <br />Figures 5A, 5B, and 5C: Development Scenarios <br />Figures 6A, 6B, and 6C: Sanitary Sewer and Water Improvements <br />Figure 7: Roadway Improvements <br />Appendix B: Traffic Report <br />Trott Brook Traffic Analysis, Dated June 21, 2021 <br />Prepared by: Bolton & Menk, Inc. <br />Trott Brook North Infrastructure Study — City of Ramsey <br />