My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/08/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 02/08/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:16:12 PM
Creation date
2/10/2022 8:39:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/08/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />October 21, 2021 <br />Mr. Bruce Westby, P.E. <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Engineering Services — Riverstone South Lift Station & Riverdale Drive Trunk <br />Utilities Project <br />Dear Mr. Westby: <br />Bolton & Menk, Inc. appreciates the opportunity to submit this proposal for professional engineering <br />services related to the above referenced project. The project includes construction of a lift station, valve <br />vault, and forcemain within the Riverstone South Development. Additionally, sanitary sewer, watermain, <br />and storm sewer are proposed along the future Riverdale Drive alignment. <br />SCOPE <br />A summary of the primary project components is presented below: <br />Lift Station Site — The site is located within the southeast portion of the Riverstone South <br />development area. <br />Lift Station - A wet well structure will be installed to capture sanitary sewer flow from the <br />Riverstone South development, along with areas to the east of the lift station site. The future <br />sanitary sewer line to the east is estimated at approximately 30 feet deep. The bottom of the lift <br />station will be approximately 4 to 6 feet lower, or 34 to 36 feet deep. <br />Valve Vault — The structure will be placed near the lift station. <br />Forcemain — The proposed forcemain will be installed through the Riverstone South <br />development, ultimately connecting to a trunk gravity sewer main proposed in Riverdale Drive. <br />The estimated length of forcemain is 2,360 feet. Final sizing of the forcemain will be completed <br />as a portion of the project design. We will work with the developer to determine the location and <br />elevation of the forcemain through the development. <br />Site Improvements — Improvements at the site will include a paved access drive and <br />maintenance pad. We will work with the developer to prepare a site grading plan. <br />Trunk Watermain — The proposed watermain improvements are derived from the 2040 <br />Comprehensive Plan and include extending a 12" watermain along the Future Riverdale Drive <br />from Llama Street to Bowers Drive. <br />Trunk Sanitary Sewer — The proposed trunk sanitary sewer improvements will include a <br />connection to the existing 18" sanitary sewer main at Llama Street. The sanitary sewer main will <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.