Bruce Westby, P.E. <br />October 21, 2021 <br />Page 2 <br />extend along the future Riverdale Drive alignment to the extent possible, with adequate depth <br />being the limiting factor. The remainder of Riverdale Drive sanitary sewer main will be installed <br />to Bowers Drive and will connect to the sewer main in the Riverstone South Addition. <br />Storm Water Improvements — The below -ground storm water improvements will be installed to <br />complete the utility portion of the improvements. The design will meet State -Aid drainage <br />calculation requirements. The design will be based upon storm water ponding sites currently <br />being coordinated with developers of the adjacent sites. The storm water ponds will be <br />constructed as a portion of the Riverdale Drive roadway improvements. <br />A summary of the design alternate is presented below: <br />• Trunk Watermain Loop— The proposed watermain loop improvements are also derived from <br />the 2040 Comprehensive Plan. connecting the Riverdale Drive trunk watermain to the Bunker <br />Lake Boulevard trunk watermain. The work consists of directionally drilling and jacking <br />underneath TH 10 and the Burlington Northern (BN) Railway. <br />A figure is attached that generally depicts the lift station and trunk utility improvement locations. <br />WORK PLAN & ASSUMPTIONS <br />Our Work Plan includes all services required to deliver the project and is based on the best information <br />available and accounts for minor scope revisions as the project moves forward. Our services are <br />anticipated to include: <br />Task 1: Project Management, Meetings and Procedural <br />Agency Coordination Meetings (2 Meetings) <br />Meetings are anticipated as described below: <br />City of Ramsey (Two Meetings) <br />Two meetings are anticipated with City of Ramsey staff. These meetings will discuss findings, <br />issues, needs, and schedule to keep the project progressing. <br />Lower Rum River Watershed Management Organization (Telephone and Email <br />Communications) <br />We will communicate with representatives of the Lower Rum River Watershed Management <br />Organization to discuss the project scope and determine permitting requirements. <br />Developer / Developer's Engineer <br />We will coordinate as needed to allow for seamless integration of the lift station and forcemain <br />with proposed improvements by the developer. We will keep the City appraised of all <br />communications with the developer. <br />Task 2: Data Collection, Analysis and Review <br />Topographical Survey <br />The topographic survey includes the proposed corridor from Llama Street to Bowers Drive. We have also <br />assumed that a survey of a potential ponding area will be required, along with survey of the TH 10 <br />median(s), right turn lane(s) in anticipation of the of the Riverdale Drive Roadway Improvements. We <br />have assumed both existing ground data, along with proposed grading information will be provided to us <br />Bolton & Menk is an equal opportunity employer. <br />