Laserfiche WebLink
Bruce Westby, P.E. <br />October 21, 2021 <br />Page 3 <br />by the developer within the proposed development. We will review the information and use it to add to <br />our base drawing for the project. <br />• Trunk watermain loop area from Riverdale Drive to Bunker Lake Boulevard is included as an <br />alternate. <br />We will work with the City to complete the Right -of -Way acquisitions as needed. <br />Geotechnical Exploration <br />We will work with American Engineering Testing (AET) to complete borings along Riverdale drive and <br />one deep boring in the area of the proposed lift station. The deep soil bring will be used to determine soil <br />types, groundwater elevation and structural capacity of the soils. As a portion of their services. AET will: <br />• Provide utility clearance, <br />• Drill one deep boring (exact depth to be determined), <br />• Drill 4-6 medium depth borings along Riverdale Drive <br />• Provide laboratory testing services, and <br />• Provide a geotechnical report. <br />Trunk watermain loop borings from Riverdale Drive to Bunker Lake Boulevard are included as an <br />alternate. <br />Task 3: Preliminary Design Alternatives <br />We will prepare a design layout for review and consideration. Benefits and impacts of the layout <br />developed will be presented for review and consideration. The layout will include access drive, lift <br />station, valve vault, maintenance pad, generator pad, and construction limits. <br />Pump and Forcemain Sizing <br />We will complete a pump design and forcemain sizing during the preliminary design phase of the project. <br />Once the pump and forcemain design has been completed, we will proceed to design the lift station wet <br />well and valve vault for the site. <br />Utility Coordination <br />We will contact private utility companies whose facilities may be impacted by construction. This will <br />include sending preliminary layout drawings and final construction plans to the utility companies. We <br />will also contact power suppliers to determine requirements for providing service to the site. Coordination <br />with developers and the City related to the storm water pond will also be required. <br />Preliminary Cost Estimates <br />The preliminary cost estimates will be completed to verify the construction estimates for the work. <br />Task 4: Construction Documents, Permitting and Approvals <br />Construction Plans and Specifications <br />Bolton & Menk will provide the City of Ramsey with final review construction plans and specifications. <br />Bolton & Menk will incorporate all City of Ramsey comments prior to completing final plans and <br />specifications for bidding. <br />Bolton & Menk is an equal opportunity employer. <br />