My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/22/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 02/22/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:17:52 PM
Creation date
3/1/2022 11:41:58 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/22/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
512
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 18. <br /> Meeting Date: 02/22/2022 <br /> By: Bruce Westby,Engineering/Public <br /> Works <br /> Information <br /> Title <br /> Adopt Resolution#22-054 Approving Amended Plans and Specifications and Advertisements for Bids for <br /> Improvement Project#22-05, Riverdale Drive Trunk Utility Improvements, Llama Street to Bowers Drive <br /> Purpose/Background: <br /> Purpose <br /> The purpose of this case is to adopt Resolution#22-040 approving amendments to the plans and specifications and <br /> advertisements for bids for Improvement Project#22-05,Riverdale Drive Trunk Utility Improvements, Llama <br /> Street to Bowers Drive. <br /> Background: <br /> On February 8, 2022,the City Council adopted Resolution#22-040 approving plans and specifications and <br /> authorizing advertisements for bids for Improvement Project#22-05, Riverdale Drive Trunk Utility Improvements, <br /> Llama Street to Bowers Drive. The plans presented to Council that evening included a proposed trunk watermain <br /> loop under Highway 10 and the BNSF Railway that serves to connect the trunk watermain proposed under <br /> Riverdale Drive to the existing trunk watermain under Bunker Lake Boulevard at Puma Street. This allows water to <br /> be routed to users from numerous directions to allow uninterrupted water use in the event of a watermain break or <br /> while work is being performed on the water supply system. <br /> As was previously discussed, the trunk utility improvements under the proposed extension of Riverdale Drive are <br /> proposed to be constructed before the proposed street improvements (Improvement Project#20-05)to better <br /> facilitate the proposed construction schedule for the Riverstone South development. By doing this,the trunk utility <br /> plans will not need to follow the same MnDOT plan review process as the street improvement plans allowing the <br /> utility improvements to be bid and constructed well in advance of the street improvements, which will minimize the <br /> construction schedule for Improvement Project#20-05. <br /> Following Council adoption of Resolution#22-040, advertisements for bids were published in the Anoka Union <br /> Herald and in Finance &Commerce on Friday, February 11 th, and again on Friday,February 18th, 2022. However, <br /> before the advertisements were published, Bolton and Menk was informed by MnDOT that the trunk watermain <br /> loop improvements proposed in the plans under Highway 10 and the BNSF Railway would require a rigorous plan <br /> review process including reviews by many of MnDOT's functional groups. This is because constructing the <br /> watermain loop would have impacts within the MnDOT right-of-way. Based on the amended plans, all work is now <br /> within City right-of-way. <br /> Since leaving the watermain loop in the plans would have increased MnDOT's plan review process by 5 weeks or <br /> more,potentially pushing the project completion date out to mid-September or later, Bolton and Menk amended the <br /> approved plans, specifications and bid advertisements to remove the trunk watermain loop improvements. Council <br /> approval of these amendments is therefore being requested after the fact. <br /> Based on the amended plans, construction of the trunk utilities is anticipated to start in May, depending on weather <br /> and Contractor availability, and to be complete by August,before the street improvement project is anticipated to be <br /> under construction. The trunk utilities improvements are anticipated to take 7 to 8 weeks to construct, including the <br /> lift station within the Riverstone South plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.