My WebLink
|
Help
|
About
|
Sign Out
Home
03/08/22
Ramsey
>
Public
>
City Update
>
2022
>
03/08/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:54:19 AM
Creation date
3/11/2022 2:26:34 PM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
City Update
Document Date
12/31/2022
Document Title
03/08/22
Retention Date
12/31/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The added noise and air pollution from the added traffic. <br />• Harm and displacement of the wildlife in the area. <br />• Has a study been done by the Army Corp of Engineers on the impact to the federal flood <br />plain and wetlands. <br />• Has it been reviewed by a Hydrologist for any impacts to the wetlands, private wells and <br />septic system functions. <br />• There should be a comprehensive traffic study that includes the future development to the <br />north, PACT school & church with the consideration of all of the events that happen at <br />central park. <br />• Why is the school not following the recommendations from Minnesota's "Guide For <br />Planning School Construction Projects" document. This proposal clearly does not fit many <br />of the guidelines laid out for student and public safety and site selection. <br />• How is it going to affect our already struggling water system? <br />Driving around Ramsey, we see lots of signs for land for sale in areas that could handle a school <br />that's not in a neighborhood setting. There are lots that are specifically equipped to handle this type <br />of facility which may cost more for the property but eliminates all of the very expensive <br />infrastructure cost. In the end, it would be much more cost effective, safer for the students and <br />public and shorten their construction schedule. <br />As for the church, I'm certain with the right approach, we could help them find a developer that <br />would be willing to give them a fair price for the land to build some single family homes and build on <br />our community. <br />Thank you for taking the time to listen to us but please consider a different location. <br />Sincerely, <br />Jason Patrow <br />
The URL can be used to link to this page
Your browser does not support the video tag.