My WebLink
|
Help
|
About
|
Sign Out
Home
03/08/22
Ramsey
>
Public
>
City Update
>
2022
>
03/08/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:54:19 AM
Creation date
3/11/2022 2:26:34 PM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
City Update
Document Date
12/31/2022
Document Title
03/08/22
Retention Date
12/31/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7, 3, <br />Meeting Date: 03/08/2022 <br />By: Grant Riemer, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #22-059 Accepting Bids and Awarding Contract for Improvement Project #20-07, Construction <br />of Salt Storage Building at PW Facility <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider adopting Resolution #22-059 accepting bids and awarding a contract for <br />construction of Improvement Project #20-07, Salt Storage Building at the PW Facility <br />Background: <br />Included in the original design proposal for the new PW Facility was a line item to relocate the existing salt storage <br />building to the new site. Once design of the facility started, it appeared that the budget would not allow, so the <br />relocation was put on hold. Because of the favorable bidding climate and relatively minor corrections needed during <br />construction, the contingency balance on the new PW Facility as of today is estimated at $1.2 million. <br />Project Location / Scope <br />City Improvement Project #20-07 proposes to replace the current salt storage building located at 14100 Jaspar St <br />and construct a new salt storage building at the new PW Facility located at 14199 Jaspar St <br />Existing Conditions / Proposed Improvements <br />The Cover All structure brand, which is our current salt storage building, went out of business due to <br />under -engineered structural failures within their buildings. Part of their ensuing settlement was reinforcement <br />performed by a third party, of their existing structures, including the Ramsey structure. That was only <br />reinforcement and it rendered the existing structure(s) only serviceable in -place. Moving or resale required a wholly <br />separate re -engineering of the structure. During the inspection of our existing structure with a local building <br />representative (who at the time of the reinforcements worked for the company that performed the corrections), they <br />observed the enhanced supports on the lower chord of the roof truss, as well as larger bracing between the trusses <br />that made this building viable in place, but not relocatable. <br />Notification: <br />On July 13th , the City Council approved solicitation of bids on plans and specifications as prepared by Oertel <br />Architects. Bids were advertised in the Anoka Union Herald on January 14th and 21 st . Bid information was also <br />available on Oertel Architects website starting January 26th, as well as electronically through QuestCDN. <br />On February 23rd , three (3) bids were received and opened in a public bid opening. The bids were then checked <br />for errors and omissions and were tabulated. All bids were found to comply with the approved plans and <br />specifications and advertisements for bids, and no errors or omissions were identified. A tabulation of the 3 bids is <br />below. <br />CONTRACTOR <br />TOTAL BID <br />A & B Construction <br />$469.110.00 <br />Greystone Construction <br />$564,595.00 <br />VersaCon <br />$570,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.