My WebLink
|
Help
|
About
|
Sign Out
Home
03/08/22
Ramsey
>
Public
>
City Update
>
2022
>
03/08/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:54:19 AM
Creation date
3/11/2022 2:26:34 PM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
City Update
Document Date
12/31/2022
Document Title
03/08/22
Retention Date
12/31/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project schedule <br />March 8th — Accept bids / Award contract <br />Start of Construction -TBD <br />Substantial Completion Fall 2022 <br />Time Frame/Observations/Alternatives: <br />Observations: <br />With the construction of the salt storage building at the new PW site, all PW functions will be centralized at one <br />location, with the exception of tree/brush recycling, which will continue to operate out of the former site. Locating <br />the salt storage building at the new site will provide additional operational efficiencies by eliminating the travel <br />time for staff and equipment during snow removal operations. <br />The original salt storage building will be retrofitted to hold landscaping materials, such as black dirt, wood chips, <br />ag lime, etc. <br />Funding Source: <br />PW Facility Contingency Fund - estimated balance of $1.2 million <br />Recommendation: <br />Staff recommends accepting the bid from A & B construction in the amount of $469,110.00 for construction of salt <br />storage building at 14199 Jaspar Street <br />Outcome/Action: <br />Motion to adopt Resolution #22-059 accepting bids and awarding a contract for construction of Improvement <br />Project #20-07, construction of salt storage building at 14199 Jaspar St by A & B Construction in the amount of $ <br />469,110.00. <br />Attachments <br />Resolution #22-059 <br />Proposed Salt Shed <br />Form Review <br />lnbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 03/03/2022 10:16 AM <br />Form Started By: Grant Riemer Started On: 02/25/2022 11:58 AM <br />Final Approval Date: 03/03/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.