Laserfiche WebLink
Trott Brook Crossing EAW August 2021 <br /> It is anticipated that construction of the development will start in April of 2022 and be phased over <br /> approximately seven years,depending on market conditions. Sanitary sewer will be extended from <br /> Nowthen Blvd NW. Construction will generally be phased from the east to the west based on market <br /> demand. The number of phases will be determined by market demand and absorption. Infrastructure <br /> will be installed at the initiation of each construction phase. In most cases, streets,water main, and <br /> sanitary sewer will only be installed to serve the upcoming phase of construction. Stormwater basins <br /> will be created at the start of each construction phase to treat stormwater and minimize potential <br /> effects of stormwater runoff. <br /> c. Project magnitude: <br /> Table 1. Project Magnitude <br /> Characteristic Number of Units <br /> Total Project Acreage 200.5 <br /> Linear project length N/A <br /> Number and type of residential units As many as 275 single- <br /> family famil detached <br /> Commercial building area(square feet) 0 <br /> Industrial building area(square feet) 0 <br /> Institutional building area(square feet) 0 <br /> Other uses—specify(acres) N/A <br /> Structure height(s) (feet) 20-3 5 <br /> d. Explain the project purpose; if the project will be carried out by a governmental unit, explain the need for <br /> the project and identify its beneficiaries. <br /> The purpose of the Trott Brook Crossing is to provide a single-family residential development in the <br /> City of Ramsey to meet market demand, in proximity to transportation corridors and open spaces. <br /> The project will be carried out by a private entity. <br /> e. Are future stages of this development including development on any other property planned or likely to <br /> happen? ❑ Yes 0 No <br /> If yes, briefly describe future stages, relationship to present project, timeline and plans for environmental <br /> review. <br /> Future stages are not planned or likely. <br /> f. Is this project a subsequent stage of an earlier project? ❑ Yes 2 No <br /> If yes, briefly describe the past development, timeline and any past environmental review. <br /> The project is not a subsequent stage of an earlier project. <br /> 7. Cover Types <br /> Estimate the acreage of the site with each of the following cover types before and after development: <br /> 3 <br />