My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 12/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:20:05 PM
Creation date
3/22/2022 2:30:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trott Brook Crossing EAW August 2021 <br /> iii. Water Appropriation. Describe if the project proposes to appropriate surface or groundwater <br /> (including dewatering). Describe the source, quantity, duration, use and purpose of the water <br /> use and if a DNR water appropriation permit is required. Describe any well abandonment. If <br /> connecting to an existing municipal water supply, identify the wells to be used as a water source <br /> and any effects on, or required expansion of, municipal water infrastructure. Discuss <br /> environmental effects from water appropriation, including an assessment of the water resources <br /> available for appropriation. Identify any measures to avoid, minimize, or mitigate environmental <br /> effects from the water appropriation. <br /> Surface/Groundwater Appropriations and Dewatering <br /> Project construction may require temporary dewatering and groundwater appropriation to facilitate <br /> installation of sanitary sewer and excavation of storm ponds. The project will not involve <br /> installation of new water wells. Project construction will require a MN DNR water appropriation <br /> permit if dewatering required for installation of utilities exceeds 10,000 gallons/day or 1 million <br /> gallons/year. The extent and duration of temporary construction dewatering needed is currently <br /> unknown. Construction dewatering may be unnecessary. Groundwater appropriated for construction <br /> dewatering will be discharged to temporary sediment basins within the project area. It is not <br /> anticipated that construction dewatering will be extensive or continue long enough to affect nearby <br /> domestic water wells. <br /> Well Abandonment <br /> The project area does not include any existing registered wells according to the Minnesota Well <br /> Index(Table 9,Appendix D). However, one unregistered well was found in the central portion of <br /> the site during the land survey for the property. The project proponent will ensure the well is <br /> abandoned in compliance with MDH requirements prior to project construction as noted under Item <br /> l l.a.ii. <br /> Connection to a Public Water Suuuly <br /> The project will be connected to the City of Ramsey municipal water supply. The City of Ramsey <br /> draws its public water supply from the Tunnel City-Wonewoc aquifer. The City currently maintains <br /> eight municipal wells with a permitted capacity to pump a total of 850 million gallons of water per <br /> year(MGY)based on Minnesota DNR water use data(Table 10). The Ramsey Water Supply Plan <br /> projects that the permitted volume of 850 MGY will not be exceeded until between 2025 and 2030. <br /> Table 10. City of Ramsey Municipal Water Appropriation Permits <br /> Annual Annual Average Use Annual Maximum <br /> Permit No. Well No. Permitted 2013-2018 (MGY) Use 2013-2018 <br /> Volume(MGY) (MGY) <br /> 1985-6005 161441 850 113.8 144.3 <br /> 1985-6005 416183 850 0.9 5.5 <br /> 1985-6005 580303 850 88.2 164.9 <br /> 1985-6005 580313 850 124.2 194.0 <br /> 1985-6005 593672 850 56.3 82.3 <br /> 1985-6005 706840 850 122.9 138.1 <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.