Laserfiche WebLink
assume the roadways surrounding the site have the current configuration. Table 4 summarizes the 2040 <br /> No-Build operations at the study area intersections. <br /> Table 4 <br /> 2040 No-Build Operations <br /> Overall/Worst Movement <br /> LOS& Delay(sec) <br /> Intersection Notes/95t" Percentile Q <br /> AM Peak Hour PM Peak Hour <br /> Variolite St NW& 173rd Ave NW/ NB Q is 28 ft in AM; <br /> 175t"Ave NW a (0.7)/a nbl (2.8) a (0.8)/a nbl (3.4) NB Q is 40 ft in PM <br /> Variolite St NW& 1611t Avenue EB Q is 41 ft in AM; <br /> NW a (1.8)/a eb (5.8) a (2.2)/a wb(6.6) EB Q is 45 ft in PM <br /> Variolite St NW&Alpine Dr NW a (2.0)/a sbl (3.9) a (1.8)/a sbl (5.0) SB Q is 45 ft in AM; <br /> SB Q is 43 ft in PM <br /> Nowthen Blvd NW& 175t" a (1.2)/ ( ) ( )/ ( )a ebl 4.8 a 2.4 a ebl 7.6 EBL Q is 33 ft in AM; <br /> Avenue NE EBL Q is 28 ft in PM <br /> Nowthen Blvd NW& 173rd NBL Q is 8 ft in AM; <br /> Avenue NW a (0.8)/a nbt(0.9) a (2.4)/a nbt(3.3) EBR Q is 9 ft in PM <br /> Nowthen Blvd NW& 167t" a (3.4)/ ( ) ( )/ ( )b ebl 12.2 a 3.8 b wbl 15.0 EB Q is 32 ft in AM; <br /> Avenue NW WB Q is 62 ft in PM <br /> Nowthen Blvd NW& Ramsey EBL Q is 49 ft in AM; <br /> Blvd NW a (3.9)/b ebl (10.8) a (4.7)/c ebl (15.4) EBL Q is 80 ft in PM <br /> 3. <br /> 1. Overall Level of Service reported from SimTraffic delay,first letter represents intersection LOS,while second letter represents worst <br /> LOS of individual approach.Upper case letters indicate signalized intersection,and lower-case letters indicate unsignalized intersection <br /> 2. 95th percentile queues are a result from an average of 10 SimTraffic simulations. <br /> The results shown in Table 4 indicate all intersections and worst movements are expected to operate at <br /> acceptable LOS in 2040 without the proposed project. Further, the results indicate all intersections will <br /> experience short vehicle queues. (Again, when the operations of the intersection and critical movements <br /> are at LOS A,the random number generator can sometimes result in slightly better delay or queuing results <br /> on minor movements even with higher traffic conditions.) It is note,the left turning volume from Ramsey <br /> Blvd to Nowthen Blvd is great enough to consider a change in traffic control in 2040 at this intersection, <br /> however, the forecast operations and queues are acceptable. It is suggested this intersection be monitored <br /> as volumes in the area grow to determine if safety or traffic control changes are needed. Table 5 summarizes <br /> the results of the 2040 Build traffic operational analysis, assuming no improvements or mitigation. <br /> Traffic Impact Study Page 22 Sotarra-Trott Brook <br /> S2 Traffic Solutions August 10,2021 <br />