Laserfiche WebLink
Table 5 <br /> 2040 Build Operations <br /> I I Overall LOS& Delay(sec) <br /> Intersection Notes/95t" Percentile Q <br /> AM Peak Hour PM Peak Hour <br /> Variolite St NW& 173rd Ave NW/ NB Q is 30 ft in AM; <br /> 175t"Ave NW a (0.5)/a nbl (2.3) a (0.4)/a nbl (2.3) NB Q is 31 ft in PM <br /> Variolite St NW&Site Access WB Q is 30 ft in AM; <br /> (170th Ave NW) a (0.9)/a wbl (3.9) a (0.8)/a wbl (4.7) Wg Q is 21 ft in PM <br /> Variolite St NW& 1615t Avenue EB Q is 43 ft in AM; <br /> NW a (2.1)/a eb (5.8) a (1.8)/a wb(6.4) EB Q is 46 ft in PM <br /> Variolite St NW&Alpine Dr NW a (2.2)/a sbl (4.2) a (2.0)/a sbl (5.6) SB Q is 46 ft in AM; <br /> SB Q is 44 ft in PM <br /> Nowthen Blvd NW& 175t" a (1.3)/ ( ) ( )/ ( )a ebl 6.2 a 2.8 b ebl 11.9 EBL Q is 26 ft in AM; <br /> Avenue NE EBL Q is 45 ft in PM <br /> Nowthen Blvd NW& 173rd a (2.2)/ ( ) ( )/ ( )a ebl 8.9 a 3.8 b ebl 13.6 EBL Q is 56 ft in AM; <br /> Avenue NW EB Q is 44 ft in PM <br /> Nowthen Blvd NW& 167t" EB Q is 40 ft in AM; <br /> Avenue NW a (3.8)/a wb (9.4) a (4.9)/c wb(20.3) Wg Q is 70 ft in PM <br /> Nowthen Blvd NW& Ramsey EBL Q is 38 ft in AM; <br /> Blvd NW a (5.0)/c ebl (18.1) a (8.9)/e ebl (36.9) EBL Q is 187 feet in PM <br /> 3. <br /> 1. Overall Level of Service reported from SimTraffic delay,first letter represents intersection LOS,while second letter represents worst <br /> LOS of individual approach.Upper case letters indicate signalized intersection,and lower-case letters indicate unsignalized intersection. <br /> 2. 95th percentile queues are a result from an average of 10 SimTraffic simulations. <br /> The results shown in Table 5 indicate all intersections are expected to operate at acceptable overall LOS in <br /> 2040 with the proposed project. Further, the results indicate all intersections will experience short to <br /> moderate vehicle queues, which are typical for peak hour conditions. (Again, when the operations of the <br /> intersection and critical movements are at LOS A, the random number generator can sometimes result in <br /> slightly better delay or queuing results on minor movements even with higher traffic conditions.) However, <br /> the eastbound approach to Nowthen Boulevard NW from Ramsey in the PM Peak hour will be at capacity, <br /> and changes to the traffic control should be considered. Preliminary review of traffic signal and roundabout <br /> warrants suggest this intersection will satisfy peak hour warrant in the 2040 planning horizon year. <br /> Operational analysis of the potential traffic control change options indicates all movements will operate at <br /> LOS B or better, with short queues. It is noted if traffic control changes occur modifications to the <br /> intersection geometry will be needed. Review of minor modifications such as converting the northbound <br /> by-pass lane to a dedicated left turn lane will improve safety and show a slight reduction in northbound left <br /> Traffic Impact Study Page 23 Sotarra-Trott Brook <br /> S2 Traffic Solutions August 10,2021 <br />