Laserfiche WebLink
Project Name Department Project# Priority Project Cost <br /> Total for:Priority 1 855,000 <br /> Priority 2-New Addition (High) <br /> HWY 10 and BNSF RR Grade Separation at Ramsey Street Improvements 16-STR-002 2 11000,000 <br /> Blvd <br /> HWY 10&BNSF RR Grade Separation at Sunfish Lk BI Street Improvements 16-STR-003 2 1,000,000 <br /> Total for:Priority 2 2,000,000 <br /> Priority 3-Existing Obligation (Med) <br /> Replace 1 R Siren Capital Equipment CIVIL-1 R 3 15,000 <br /> Replace 2R Siren Capital Equipment CIVIL-2N 3 15,000 <br /> Replace Engine#21 (565) Capital Equipment FIRE-502 3 325,000 <br /> Replace Fire Prevention Vehicle#571 Capital Equipment FIRE-566A 3 45,000 <br /> Replace Fire Chief Vehicle(569) Capital Equipment FIRE-569A 3 50,000 <br /> Replace Maintenance Vehicle(564) Capital Equipment GENGOV-001 3 60,000 <br /> Replace 2013 F-250 Pickup Unit#410 Capital Equipment GENGOV-004 3 42,000 <br /> 2025 Ford Explorer Replace 2021 Ford Explorer#3XX Capital Equipment POL-383 3 35,000 <br /> 2025 Chevy Caprice Replace 2021 Chevy Caprice#3XX Capital Equipment POL-384 3 33,500 <br /> 2025 Chevy Impala Replace2017 Chev Impala#377 Capital Equipment POL-385 3 33,500 <br /> Replace 2004 Tree Spade Capital Equipment PW-002 3 52,000 <br /> Replace 2004 Snow Thrower Capital Equipment PW-005 3 130,000 <br /> Replace 2019 Brush Chipper-Unit#605 Capital Equipment PW-605 3 40,000 <br /> Replace 2007 Chevy Pickup: Unit#665 Capital Equipment PW-665 3 27,000 <br /> Replace Unit 688 2015 Case Loader Capital Equipment PW-688 3 210,000 <br /> Replace 2015 Kaboa ATV Unit#689 Capital Equipment PW-689 3 20,000 <br /> Replace 2015 Kabota Mower Capital Equipment PW-690 3 20,000 <br /> Replace 2016 Street Sweeper-Unit#694 Capital Equipment PW-694A 3 225,000 <br /> Reconstruction Streets: Rodeo Hills/Valley View Street Improvements 17-STR-009 3 8847312 <br /> 2025 Neighborhood Overlays Street Improvements 21-STR-013 3 17098,355 <br /> Sorteberg's Street Reconstruction Street Improvements 22-STR-002 3 1841756 <br /> Total for:Priority 3 3,545,423 <br /> Priority 4-New Addition (Med) <br /> Sweeper Scrubber Capital Equipment GENGOV 003 4 30,000 <br /> New Velocity Patcher Capital Equipment PW-700 4 250,000 <br /> New Electric Utility Vehicle Capital Equipment PW-702 4 35,000 <br /> Rabbit Park Phase Two Park Improvements 06-PARK 012 4 1257000 <br /> Total for:Priority 4 440,000 <br /> Priority 5-Opportunity/Unfunded/Placeholder <br /> Trail Connections Park Improvements 06-PARK 019 5 400,000 <br /> Construct Well#9 and Pumphouse#5 Water Utility 16-WTR-002 5 176001000 <br /> Total for:Priority 5 2,000,000 <br /> Total for 2025 81840,423 <br /> 2026 <br /> Priority]-Existing Obligation (High) <br /> Playground Replacement Program Park Improvements 22-PARK 001 1 100,000 <br /> Annual MSA Pavement Marking Improvements Street Improvements 22-STR-001 1 67000 <br /> Total for:Priority 1 1061000 <br /> Priority 3-Existing Obligation (Med) <br /> Core Switch Replacement Capital Equipment 17-IT-009 3 52,000 <br /> Virtual Server Refresh Capital Equipment 20-IT-001 3 33,000 <br /> Replace 3R Siren Capital Equipment CIVIL-3R 3 15,000 <br /> 18 <br />