My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/14/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 12/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:20:05 PM
Creation date
3/22/2022 2:30:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/14/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name Department Project# Priority Project Cost <br /> Replace 4R Siren Capital Equipment CIVIL-4R 3 15,000 <br /> Replace Engine#21 (565) Capital Equipment FIRE-502 3 325,000 <br /> 2026 Ford Explorer Replace 2022 Ford Explorer#3XX Capital Equipment POL-390 3 35,500 <br /> 2026 Ford Explorer replace2022 Ford Explorer#3XX Capital Equipment POL-391 3 44,000 <br /> Replace 1999 John Deere Grader: Unit#603 Capital Equipment PW-603 3 2807000 <br /> Replace 2007 International Water Truck: Unit#669 Capital Equipment PW-669 3 136,000 <br /> Replace Unit 678 2013-1ton Truck w/Plow Equipment Capital Equipment PW-678A 3 62,000 <br /> Replace Unit#686-2015 Kubota Tractor Capital Equipment PW-686 3 45,000 <br /> Replace Unit#687 2015 Toolcat Capital Equipment PW-687 3 60,000 <br /> Replace 2016-1-ton truck Unit#692 Capital Equipment PW-692A 3 75,000 <br /> Reconstruction Streets: Halls Dover Acres Street Improvements 17-STR-006 3 716,909 <br /> Reconstruction Streets: Ford Brook Est 3rd Street Improvements 19-STR-015 3 460,845 <br /> 2026 Neighborhood Overlays Street Improvements 21-STR-014 3 321,090 <br /> Flintwood Hills 2nd&3rd Street Reconstruction Street Improvements 21-STR-015 3 527,258 <br /> Section 01 Unplatted Street Reconstruction Street Improvements 22-STR-004 3 288,028 <br /> Total for:Priority 3 3,491,630 <br /> Priority 4-New Addition (Med) <br /> Irrigation for Titterud Park Park Improvements 06-PARK 010 4 76,000 <br /> Off Leash Area Park Improvements 22-PARK-004 4 257000 <br /> Zeolite Roadway Improvements Street Improvements 04-STR-012 4 1,091,000 <br /> Riverdale Drive Street Lights Street Light Utility 19-STLT-002 4 85,000 <br /> Total for:Priority 4 1,277,000 <br /> Priority 5-Opportunity/Unfunded/Placeholder <br /> Trail Connections Park Improvements 06-PARK 019 5 200,000 <br /> Alpaca Estates Outlot Site Acquisitions 08-ACQ-002 5 357000 <br /> Total for:Priority 5 235,000 <br /> Total for 2026 5,1093630 <br /> 2027 <br /> Priority]-Existing Obligation (High) <br /> Playground Replacement Program Park Improvements 22-PARK-001 1 100,000 <br /> Annual MSA Pavement Marking Improvements Street Improvements 22-STR-001 1 14,000 <br /> Total for:Priority 1 114,000 <br /> Priority 3-Existing Obligation (Med) <br /> Replace 5R Siren Capital Equipment CIVIL-5R 3 151000 <br /> Replace 6R Siren Capital Equipment CIVIL-6N 3 157000 <br /> Replace Grass 11 (562) Capital Equipment FIRE-505 3 45,000 <br /> Replace,Boat,Motor,Trailer Rescue Capital Equipment FIRE-561 3 10,000 <br /> 2027 Chev Tahoe Replace 2023 Chev Tahoe#3XX Capital Equipment POL-393 3 44,500 <br /> 2027 Chev Tahoe Replace 2023 Chev Tahoe#3XX Capital Equipment POL-394 3 44,500 <br /> 2027 Ford Utility SUV Replace 2023 Ford Utili#3XX Capital Equipment POL-395 3 36,000 <br /> Replace 2004 Pull Behind PTO Mower Capital Equipment PW-004 3 28,000 <br /> Replace Paver,Trailer,Roller Capital Equipment PW-660 3 140,000 <br /> Replace Unit 679 Area Mower(2020 Replaced) Capital Equipment PW-679A 3 111,000 <br /> Replace 2017 UTV-Unit#695 Capital Equipment PW-695 3 20,000 <br /> Replace 2017 UTV-Unit#696 Capital Equipment PW-696 3 20,000 <br /> Stormwater Drainage Improvements Stormwater Utility 12-STRM-001 3 350,000 <br /> Reconstruction Streets:Barthels Rum River Acres Street Improvements 17-STR-001 3 8227938 <br /> Reconstruction Streets: Sortebergs 6th Street Improvements 17-STR-007A 3 6807295 <br /> 2027 MSA Overlays Street Improvements 21-STR-016 3 485,216 <br /> 2027 Neighborhood Overlays Street Improvements 21-STR-017 3 783,875 <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.