My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/22/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 03/22/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:27:31 PM
Creation date
3/23/2022 10:56:51 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/22/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
765
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with silt, these materials are well suited for pavement support and are considered non-frost susceptible and are also <br /> free draining materials. With the sub-base material being sufficient, Staff is proposing to use the current standard <br /> City pavement section of 4-inches aggregate base, and 3.5-inches new bituminous pavement. The 4-inches of <br /> aggregate base is proposed to be compose of recycled reclamation material. <br /> Staff review found the existing pedestrian ramps within the project area did not meet current ADA requirements, <br /> therefore all four pedestrian ramps will need to be removed and replaced. The concrete curb and gutter in the <br /> project area were found to generally be in good condition, and only spot repairs are proposed. Staff is proposing <br /> minimal impacts to the existing bituminous trail which crosses through the project,beyond what is required for <br /> matching into the new pedestrian ramps. <br /> A portion of the cul-de-sac located on the south end of Junkite Street has had some undercutting of the existing <br /> concrete curb and gutter. This project proposes to remove and replace a portion of the concrete curb and gutter, <br /> perform a full-depth restoration of the compromised road section, and provide a stabilized erosion control mat in <br /> the boulevard area to prevent future erosion of the soils. <br /> Review of the storm sewer, sanitary sewer and watermain did not find issues requiring repair. The City will be <br /> placing inflow and infiltration barriers on the sanitary sewer manholes with this project. The City received an <br /> MCES I/I Grant for this work,which will reimburse the City for the costs associated with the I/I barriers. <br /> Build Process <br /> •Install traffic control measures <br /> o These are maintained throughout the project <br /> •Install erosion control measures <br /> •Full-depth reclamation of existing bituminous pavement and aggregate base <br /> •Project removals (spot curb and gutter,pedestrian ramps, driveways as needed) <br /> •Place new concrete curb and gutter and pedestrian ramps (5 to 7-day cure time) <br /> •Remove excess reclaim material, shape and compact 5 inches of remaining material <br /> o Subgrade excavation required to remove approximately 0.5 inches below the existing reclamation <br /> material to allow 4-inch thickness <br /> o Excess reclaim is stockpiled and will be used on future City projects <br /> •Place first lift of new bituminous pavement <br /> •Finish any trail and driveway repairs <br /> o No driveway repairs are anticipated <br /> •Restore the boulevard in any impacted areas <br /> o 4 inches topsoil, seed and hydro-mulch <br /> •Place the final lift of bituminous pavement <br /> o Remove traffic control measures as allowed <br /> •Place all pavement marking,must wait 72 hours after paving <br /> •Erosion control measures are removed after restoration has been completed <br /> Preliminary Schedule Remaining <br /> •Council Approves Plans and Specifications/Authorizes Ad for Bids <br /> o March 22, 2022 <br /> • Staff Receives Bids <br /> o April 18, 2022 <br /> •Council Awards Contract to the lowest responsible bidder <br /> o April 26, 2022 <br /> •Contractor begins construction <br /> o June 2022 <br /> •Contractor Substantially Completes construction <br /> o September 2, 2022 <br /> •Contractor Final Completion(project clean up,punch list created) <br /> o September 30,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.