My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/22/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 03/22/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:27:31 PM
Creation date
3/23/2022 10:56:51 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/22/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
765
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 15. <br /> Meeting Date: 03/22/2022 <br /> Submitted For: Joe Feriancek, Engineering/Public Works <br /> By: Joe Feriancek, Engineering/Public Works <br /> Information <br /> Title <br /> Adopt Resolution#22-075 Approving Plans and Specifications and Authorizing Advertisements for Bids for 2022 <br /> Neighborhood Pavement Overlay Improvements, Improvement Project#22-04 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#22-075 Approving Plans and Specifications and Authorizing <br /> Advertisements for Bids for 2022 Neighborhood Pavement Overlay Improvements, Improvement Project#22-04. <br /> Background: <br /> City Improvement Project 22-04 proposes to overlay the streets within the Sunfish Lake Business Park 2nd, <br /> Sunflower Ridge, Tiger Meadows, and The Ponds of Ramsey subdivisions. The streets total approximately 14,200 <br /> (2.69 miles) in length,vary in width between 32 and 42 feet wide urban section. A street segment summary is <br /> attached to this case. <br /> Project History <br /> •2022—2031 Capital Improvement Program—listed as street overlay for 2022 <br /> •Resolution#21-194, adopted July 13, 2021; City Council ordered the City Engineer to request proposals for <br /> Topographic Survey for 2022 Pavement Management Program project. <br /> •Resolution#21-224, adopted August 10, 2021; City Council awarded a proposal to Hakanson Anderson for <br /> Topographic Survey of the project area. <br /> •Resolution#21-306, adopted October 26, 2021; City Council ordered the City Engineer to prepare plans and <br /> specifications for the improvement project. <br /> •March 15, 2022; Public Works Committee gave recommendation for City Council approving plans and <br /> specifications and authorizing advertisement for bids for 2022 Neighborhood Pavement Overlay <br /> Improvements, Improvement Project#22-04. <br /> Pavement History <br /> The streets within the subdivisions were generally built between 2002 and 2003. Pavement maintenance has <br /> included 2 crack seal/seal coat improvements. 2021 PASER values were 7 for all street segments. Ground <br /> Penetrating Radar(GPR)was performed on some of the street segments within the project area, and are <br /> summarized in the street segment summary. <br /> Proposed Improvements <br /> Based on Staff review of the existing pavement sections, and condition of the existing pavements, a mill and <br /> overlay of the existing pavement is appropriate. The proposed mill and overlay will very between 1.5 and 2 inches <br /> thick dependent upon the existing pavement thicknesses. <br /> Staff review found the existing pedestrian ramps within the project area did not meet current ADA requirements, <br /> therefore all pedestrian ramps within the project area will need to be removed and replaced. The concrete curb and <br /> gutter in the project area were found to generally be in good condition, and only spot repairs are proposed. <br /> Minor repairs to the existing storm sewer structures are proposed with this project,the majority of which are <br />
The URL can be used to link to this page
Your browser does not support the video tag.