grouting the existing adjustment rings and pipe inverts. Some storm sewers catch basins will require resetting due <br /> to settling. <br /> The City will be placing inflow and infiltration barriers on the sanitary sewer manholes with this project. The City <br /> received an MCES I/I Grant for this work,which will reimburse the City for the costs associated with the I/I <br /> barriers. <br /> Build Process <br /> •Install traffic control measures <br /> o These are maintained throughout the project <br /> •Project removals (spot curb and gutter,pedestrian ramps) <br /> •Place new concrete curb and gutter and pedestrian ramps (5 to 7-day cure time) <br /> •Mill existing pavement <br /> •Finish structure adjustments, storm sewer catch basin repairs <br /> •Restore the boulevard in any impacted areas <br /> o 4 inches topsoil,turf <br /> •Place new bituminous pavement <br /> o Remove traffic control measures as allowed <br /> Preliminary Schedule Remaining <br /> •Council Approves Plans and Specifications/Authorizes Ad for Bids <br /> o March 22, 2022 <br /> • Staff Receives Bids <br /> o April 18, 2022 <br /> •Council Awards Contract to the lowest responsible bidder <br /> o April 26, 2022 <br /> •Contractor begins construction <br /> o June 2022 <br /> •Contractor Substantially Completes construction <br /> o September 2, 2022 <br /> •Contractor Final Completion(project clean up,punch list created) <br /> o September 30,2022 <br /> Staff proposes to open bids on April 18, 2022, and to present the bid results to City Council on April 26, 2022 for <br /> award of a construction contract to the lowest responsible bidder. <br /> Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case to <br /> prepare and submit their bids,rather than purchasing the plans through QuestCDN, the electronic bidding software <br /> used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and all bidders are <br /> notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet showing the <br /> scope of the improvements. Plans are available upon request from the City Engineer. <br /> Notification: <br /> If Council approves plans and specifications and authorizes advertising for bids,bids will be advertised on Friday, <br /> March 25, and again on Friday,April 1, 2022,both in the City's official newspaper, the Anoka Union Herald, and <br /> in Finance & Commerce. <br /> Additionally, letters will be mailed to property owners with updates on the project status. Engineering Staff <br /> maintains a project webpage,which will be updated as new information is made available throughout the project. <br /> Observations/Alternatives: <br />