CC Regular Session 7. 5. <br /> Meeting Date: 05/10/2022 <br /> Submitted For: Bruce Westby,Engineering/Public Works <br /> By: Joe Feriancek, Engineering/Public Works <br /> Information <br /> Title: <br /> Adopt Resolution#22-105 Accepting Bids and Awarding Contract for 2022 Crack Seal Improvements, <br /> Improvement Project#22-08 <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution#22-105 Accepting Bids and Awarding Contract for 2022 Crack <br /> Seal Improvements, Improvement Project#22-08. <br /> Background: <br /> Crack seal improvements are completed annually on typically 10 to 23 miles of public street segments to <br /> cost-effectively maximize the life of the bituminous pavement. <br /> Crack sealing protects pavement by preventing stormwater runoff from seeping through cracks in the pavement and <br /> joints between the pavement and concrete curb and gutter and utility castings to reduce pavement damage due to <br /> wet subgrade soils, especially during freeze-thaw cycles. <br /> The City's current pavement maintenance schedule calls for public streets to be crack sealed the third, seventh, and <br /> fourteenth year following construction, reconstruction, and overlay improvements. However,while this is the <br /> typical maintenance schedule it is important to note that Staff reviews the condition of all streets annually and <br /> adjusts the schedule of all pavement maintenance operations based on actual pavement conditions. <br /> A total of 10.4 miles of public street segments are proposed to receive crack seal improvements in 2022. These <br /> street segments were selected based on age,pavement maintenance history, and Pavement and Surface Evaluation <br /> Rating(PASER)values of 7 or higher. <br /> Plans and specifications for the 2022 Crack Sealing Improvements were prepared in-house as part of Staff s normal <br /> duties. A copy of the plans is attached to this case. <br /> Preliminary Schedule Remaining <br /> •Council awards Contract to the lowest responsible bidder <br /> o May 10, 2022 <br /> •Contractor begins construction <br /> o June 2022 <br /> •Contractor completes construction <br /> o July 29, 2022 <br /> Notification: <br />