Laserfiche WebLink
upgrade has a larger impact on the overall building. The impact for the Parking <br /> Facility would be less. <br />5. The cost of the upgrade should nOt be compared directly to the cost of the <br /> Municipal Center upgrade due to differing circumstances. <br />6. Precast concrete formliner does not have mortar joints, and won't require the <br /> same maintenance needs as stone. <br />7. Using the Kasota stone to tie together the Municipal Center and the Parking <br /> Facility is not necessary. The buildings were intended to have complimentary <br /> materials, but not necessarily the same materials. <br /> <br />CC: File (0414.03\2005 lO04_BOIson.mem.doc) <br /> <br />-190- <br /> <br /> <br />