My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 10/13/2005
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2005
>
Agenda - Parks and Recreation Commission - 10/13/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 3:11:56 PM
Creation date
10/10/2005 2:30:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
10/13/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary ?lat ~eview: Summerset ~feadows <br />&;[~ternber 30, 2005 <br /> <br />Site I'lan~ArchitecturaI: From the information that you have supplied, it appears, that <br />I~hc townhome units will meet and exceed ~he architectural standards for tbwnhomes. The <br />unit;~ will ha~e an exterior pale~e of-six colors and will contain several desired <br />~cchitecmral design elements (donners, bay windows~ shutters, and articulated facades). <br />'Fhe units will have at least 1~% coverage of brick/stone on th~ fi:oat elevations. <br />Towr~home standards dictate that at least 3~% of thc front elevations consist of ~ese <br />material~ unless additional-architectural' elements and color~ are used. The townhome <br />unit.~ qualify for this exemption since there will be at least fiw colors used on ~he <br />,~x~eriors and theywill be using multiple desired architectural elements. <br /> <br />The ~lty still needs information regarding the single-family units as well as architectural <br />elevations for all of the proposed units. <br /> <br />Stormwater Management Fee:. A stormwater management fee must be paid for the new <br />lots being created. The 2005 rate is $384.00per Unit. The rate in effect at the time of the <br />final plat approval will be the one charged for ~he development. <br /> <br />Server and Water Trunk Fee: 'The city has established a sanitary sewer and water l:runk <br />l:be that must be paid prior to release of the final plat for recording. The 2005 Rate is <br />$2962 pe[ lot. The rate in effect at the time of the final plat approval will be the one <br />charged for the development. ' : <br /> <br />[lEU hrumber: The City has enacted a quarterly drainage UtiliW:~harge' that is applicable <br />to each unit in the proposed development 'that. is collected quarterly on' the property - <br />owt~er's util~ity bill. <br /> <br />Thc Ramsey Planning Commission will be meeting at 7:00 p.m. on Thursday, October 6, <br />2005 at the Ramsey Fire Station located at 15050 Armstrong Boulevard, to consider your <br />request for preliminary plat review. Ir'is important that 3;ou; or your representative,'be <br />present to answer any questions that may arise. <br /> <br />Respt~'tztfUlly, <br /> <br />CITY' O'F RAMSEY <br /> <br />P~ t~.acl< T~udgeon, AICP <br />(',~)mmun. ity Development Director <br /> <br />Leonard Linton, P.E. <br />Civil Engineer'II - :-. <br /> <br />37 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.