Laserfiche WebLink
Student enrollment at the new facility is planned to reach approximately 790 students over a 5-year period. <br />PACT Charter School anticipates most of its student population will use Bus drop-off and pick-up, Parent <br />drop-off and pick-up and Student drivers. PACT anticipates 60% (474 students) of the students will utilize 12- <br />14 traditional, yellow, full-size or short-size buses for school transit at this time. PACT anticipates 25% (198 <br />students) will be parent drop off and pick up and the remaining 15% (119 students) will be student drivers. <br />PACT anticipates approximately 130 full time school faculty and staff members with an additional 30 part <br />time faculty. There are currently 293 parking stalls on the Site Plan which would adequately accommodate <br />the schoolÓs needs. <br /> <br />Our parking requirements are calculated at full enrollment as follows: <br /> <br />Parking Calculation Required <br />Staff FTE Parking 130 <br />Staff Part-Time Parking 15 <br />Student Parking 119 <br />Visitor Parking 10 <br />Total Required Parking 274 <br />Total Parking Provided 293 <br />Over (Under) 19 <br />The City of Ramsey zoning does identify requirements for parking associated with assembly uses. PACT <br />development plans for assembly spaces include proposed seating capacities of 700 gym bleacher seats, 700 <br />field bleacher seats, and 350 auditorium seats. PACT does not anticipate an overlap in scheduling of these <br />spaces. The City of Ramsey requires 1 parking stall per 5 lineal feet of seating for assembly uses. The gym will <br />have approximately 1,200 linear feet of interior seating requiring less than 240 spaces. <br /> <br />PACT is also in current conversation with the Seller of this property to put in place a shared access agreement <br />across PACT property and the sellerÓs remaining 15-acres. The seller is planning to develop a church on their <br />property. The hours of operation between the two pair well to consider a shared parking arrangement for <br />parking overflow. <br />Building: <br />The proposed new building for PACT is approximately 32Ó maximum in height. Exterior wall materials and <br />finishes, in accordance with the B-1 General Business District standards, consist primarily of pre-cast concrete <br />wall panels with a mix of integrally colored exposed aggregate panels and smooth precast wall panels with <br />field applied penetrating colored stain. The building will have dark anodized storefront window frames and <br />low-e insulated glazing into most occupied spaces in the building. <br /> <br />The Minnesota Department of Education reviewed PACTÓs proposed plans at this site through the formal <br />Review & Comment process as required by the State. PACT received formal approval from MDE on March <br />15, 2022, for these expansion plans which included reference to the proposed site plan and floor plans. <br /> <br /> <br /> <br /> <br />RealEstateAdvisorsProjectManagers <br />JBVangPartners,Inc.|1335PierceButlerRoute|St.Paul,MN55104 <br />M:651.645.5500|F:651.645.3907|www.jbvang.com <br /> <br />