My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/24/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 05/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:31:54 PM
Creation date
5/25/2022 8:43:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/24/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Funding for this improvement is proposed to come from MSA Funds, Stormwater Utility Funds, and Sanitary Sewer <br /> Utility Funds. Sanitary Sewer Funds will be reimbursed through an Inflow&Infiltration Grant. <br /> • Street Project Costs $599,824.08 <br /> • Storm Sewer Project Costs $79,132.05 <br /> • Sanitary Sewer Project Costs $10,947.00 <br /> •Total Project Costs$689,903.13 <br /> Hakanson Anderson proposes to provide construction staking in a total not-to-exceed amount of$3,055.00. These <br /> costs are included in the 23-percent indirect costs. Staff feels these costs are reasonable based on the scope of the <br /> proposed improvements and required staking and recommends accepting the proposal,which is attached for <br /> reference. <br /> City Staff proposes to administer and inspect construction. <br /> Plans and specifications were prepared in-house as part of Staffs normal duties. <br /> Outside costs incurred to date as engineering indirect costs include: <br /> • $4,920.00 for Haugo Geo Technical Services, LLC to supply a geotechnical report of the project area. <br /> • $12,310.30 for Hydro-Klean, LLC to perform sanitary sewer and storm sewer cleaning and supply reports of <br /> pipe conditions within the project area. <br /> • $435.00 for Water Conservation Services, Inc. to perform a water leak test on the watermain system in the <br /> project area. <br /> • $2,500.00 for Hakanson Anderson to collect topographic survey of the project area. <br /> Recommendation: <br /> Staff recommends Alternative#1. <br /> Outcome/Action: <br /> Motion to adopt Resolution#22-115 accepting bids and awarding a construction contract for Sunwood Drive and <br /> Waco Street Reconstructions, Improvement Project#22-01,to Novco, Inc. for the bid in the amount of$560,896.85. <br /> Attachments <br /> 22-01 Final Plans <br /> 22-01 Street Summary <br /> Hakanson Staking Proposal <br /> Res 22-115 <br /> Form Review <br /> Inbox Reviewed By Date <br /> Brian Hagen Brian Hagen 05/19/2022 02:37 PM <br /> Form Started By:Bruce Westby Started On:05/16/2022 02:51 PM <br /> Final Approval Date:05/19/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.