My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/21/2022
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2022
>
Agenda - Public Works Committee - 06/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:37:35 AM
Creation date
6/20/2022 3:24:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 6.1. <br />Meeting Date: 06/21/2022 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Receive Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />. Sunwood Drive & Waco Street Reconstructions (IP #22-01) <br />o Contract awarded to Novco, Inc. May 24, 2022 <br />o Contract execution in progress <br />• Autumn Heights Street Reconstructions (IP #22-02) <br />• Plans were prepared in-house <br />• Council to consider approving plans and authorizing bids June 28, 2022 <br />• 2022 Neighborhood Street Overlay Improvements (IP #22-04) <br />o Contract awarded to North Valley, Inc. May 10, 2022 <br />o Pre -construction meeting held June 8, 2022 <br />o Construction in progress <br />• Riverdale Drive Trunk Utility Improvements (IP #22-05) <br />• Construction in progress — sanitary sewer lift station <br />• Construction proposed for completion by end of July 2022 <br />• Wood Pond Hills 2nd, 3rd, 4th, 5th Street Reconstructions (IP 422-06) <br />o Contract awarded to North Valley, Inc. May 10, 2022 <br />o Pre -construction meeting held June 8, 2022 <br />o Construction proposed to begin mid -July 2022 <br />• 2022 Crack Seal Improvements (IP #22-08) <br />o Construction completed <br />• 2022 Pavement Rejuvenation Improvements (IP #22-09) <br />o Construction proposed to begin mid -July 2022 <br />• 2022 MSA Pavement Striping Improvements (IP #22-13) <br />o Plans are being prepared in-house <br />o Council to consider approving plans & authorizing quotes July 12, 2022 <br />• 15410 Argon Street Drainage Improvements (IP #22-14) <br />o See case on June 21, 2022 PWC agenda for details <br />o Council to consider authorizing plans and specifications June 28, 2022 <br />• WTP Trunk Watermain Improvements (#21-08) <br />• First bids rejected <br />• Plans will be revised to minimize project costs without sacrificing quality, and to include necessary <br />WTP commissioning improvements (well -house valves, etc.). <br />• Council to consider revised contract with SEH, Inc. July 2022 <br />• Council to consider re -bidding revised plans August/September 2022 <br />• April 2024 completion deadline <br />• Centralized Water Treatment Plant (#21-09) <br />• AE2S is preparing plans and handling construction administration <br />• 90-percent plans to be submitted for Staff review soon <br />
The URL can be used to link to this page
Your browser does not support the video tag.