Laserfiche WebLink
. Project completion proposed by Spring 2024 (before water use increases) <br />• Fire Station No. 1 Parking Lot Improvements (#21-10) <br />• Construction in progress <br />• Ramsey Gateway Highway 10 Improvements (IP #20-11) <br />• Final design and property acquisitions in progress <br />• Bolton & Menk is preparing plans and specifications <br />• 60-percent plans to be submitted for Staff review soon <br />• Construction anticipated Fall 2023 through early 2026 (2024/25 majority) <br />• Council to consider potential City -led project to advance construct Riverdale Drive east of Sunfish <br />Lake Boulevard in Spring/Summer 2023 during the City Council Work Session June 28, 2022 <br />• Riverdale Drive Extension — Llama Street to Bowers Drive (IP #20-05) <br />• Plans are complete and in for final review and approval by MnDOT State Aid <br />• Council to consider approving plans and authorizing bids June 28, 2022 <br />• Construction proposed for completion by October 2022 <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />o Requested by Minnesota DNR <br />o Staff is preparing plans, including boardwalk reconstruction <br />o Construction proposed for 2023 <br />City of Anoka Improvement Projects <br />• Highway 47 Corridor Improvements <br />• Construction proposed for 2025 <br />• Anoka webpage https:Hclients.bolton-menk.com/anokahwy47/ <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />o Anoka County received $1.35M in HSIP funds (est. project cost $1.5M) <br />o Council approved JPA May 24, 2022 (City cost share = $28,667.64) <br />o Construction proposed for 2023, pending final City & County approvals <br />MnDOT Improvement Projects <br />• Anoka Solution Highway 10 Improvements <br />o Construction underway with completion proposed in Spring 2024 <br />o Anoka webpage https://clients.bolton-menk.com/hwy10/ <br />o MnDOT webpage http://www.dot.state.mn.us/metro/proiects/hwy10-anoka/ <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />o Construction underway with completion proposed in Spring 2024 <br />o MnDOT webpage http://www.dot.state.mn.us/metro/proiects/hwy10-anoka/ <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design suspended to explore s-curve realignment <br />o $45M in bonds authorized October 2020 <br />o Construction proposed for 2024 (or later) <br />o A public Open House was held on May 25 (handouts attached) <br />o MnDOT webpage http://www.dot.state.mn.us/metro/proiects/hwy47rr-anoka/ <br />• Rum River Bridge Replacement <br />• Construction underway with completion proposed in Spring 2024 <br />• Proposing three lanes each direction between Highway 47 and 7th Street <br />• MnDOT webpage http://www.dot.state.mn.us/metro/proiects/hwy10-anoka/ <br />Studies & Items of Interest <br />. 5805 148th Lane NW <br />e No updates at this time. Property owners like everything as is. <br />