Laserfiche WebLink
FC Case # <br /> <br />APPROVE COUNTY ROAD #116 TRAIL CONSTRUCTION <br /> By: Mark Boos, Parks/Utilities Supervisor <br /> <br />Background: <br /> <br />On July 13, 2000, the Park and Recreation Commission reviewed a proposal to extend the trail <br />paving from Mallard Ponds, east to connect to the Rum River Bridge along County Road #116. <br />The Commission voted unanimously to request City Council approve the project which is <br />summarized as follows: <br /> <br />As part of Mallard Ponds town home project, the Developer is required to construct an 8' <br />bituminous trail south along Dysprosium Street NW then easterly to the plats limits. This <br />approximate 1,117' segment will be credited against the $28,200 in trail fees due. As the <br />attached portion of the development agreement indicates, the developer is also cooperating in <br />continuing this trail construction further to the intersection of T.H. 47. <br /> <br />Observations: <br /> <br />The above project may be entirely funded by Mallard Ponds trail fees. A proposed summary <br />work plan and budget for an extended project is below; <br /> <br />140a' Lane NYer south along Dysprosium Street NW to County Road #116 then east to the plat <br />limits (This segment will occur as part of the Mallard Ponds subdivision) <br /> <br />A. · Obtain permits from Anoka County for trail construction $0.00 <br /> within R.O.W <br /> · Ail grading, sub-cutting/excavation and seeding/restoration $0.00 <br /> by developer as part of concurrent activity within project. <br /> · Reimbursement of approximately 1,117' of trail construction $10,611.50 <br /> at $9.50 a lineal foot <br /> TOTAL $10,611.50 est. <br /> <br />East edge of Mallard Ponds to the intersection of T. H. 47 and County Road #116 <br /> <br />Be <br /> <br />· Sub-cutting/excavation and final grading by City Staff <br /> <br />· Seed, bale checks, and other erosion control <br />· Remove two (2) B 6/12 concrete curb sections and replace with <br /> concrete ped ramps <br />· Relocate three (3) to six (6) trees with spade <br />· Relocate guy wires <br />· Relocate Super America's irrigation (if needed) <br />· Pave approximately 1,042' of trail at $9.50 a lineal foot <br />TOTAL <br /> <br />$0.00 <br />$1,500.00 <br />$2,000.00 <br /> <br />$450.00 <br />$0.00 <br />$0.00 <br />$9,899.00 <br />$13,849.00 est. <br /> <br /> <br />