Josh Nyquist,Executive Director of Building Operations May 26,2022 <br /> PACT Charter School I Traffic Impact Study Page 18 <br /> Development Build Conditions <br /> Intersection Traffic Operations/Capacity Analysis <br /> The year 2028 Build Development Conditions intersection traffic operations/capacity analysis was <br /> completed to determine future traffic operations and development-generated traffic impacts. The <br /> capacity analysis was completed for the a.m., dismissal and p.m. peak hours at the study intersections <br /> using Synchro/SimTraffic model. Results of the Development Build Conditions traffic operations <br /> analysis are shown in Table 7. <br /> Year 2028 Weekday Development Build Conditions <br /> Results of the year 2028 Build Conditions intersection capacity analysis shown in Table 7,indicate that <br /> all study intersections are expected to continue to operate at an acceptable overall LOS B or better <br /> during the peak hours under existing traffic control and intersection geometrics. No significant <br /> queuing or delay issues were identified,except for the Armstrong Boulevard/Alpine Drive intersection <br /> where the westbound approach would continue to operate at a LOS F during the p.m. peak hour <br /> (note: no PACT Charter School traffic was assigned to this westbound Alpine Drive approach). The <br /> future conversion of Armstrong Boulevard/Alpine Drive to a single-lane roundabout will improve <br /> the westbound approach and all approaches will operate at a LOS A during the peak hours. <br /> Table 7. Year 2028 Weekday Build Conditions Peak Hour Traffic Operations/Capacity Analysis <br /> A.M. Peak Hour Dismissal Peak Hour P.M. Peak Hour <br /> Study Intersection <br /> LOS Delay Queue LOS Delay Queue LOS Delay Queue <br /> Variolite Street/173rd Avenue(1) A/A 9 sec. NB/1 A/A 9 sec. NB/1 A/A 10 sec. NB/1 <br /> Variolite Street/161st Avenue(1) A/C 16 sec. WB/1 A/B 12 sec. EB/2 A/B 11 sec. EB/1 <br /> Variolite Street/Alpine Drive(1) A/B 13 sec. SB/1 A/B 11 see. SB/2 A/B 11 sec. SB/1 <br /> Armstrong Boulevard/161st Avenue(1) A/C 16 sec. WB/1 A/C 17 sec. WB/2 A/C 17 sec. WB/1 <br /> Armstrong Boulevard/Alpine Drive(1) A/n 29 sec. WB/2 A/C 22 sec. WB/2 A/F 77 sec. WB/6 <br /> Armstrong Boulevard/Alpine Drive(3) A/A 8 sec. SB/2 A/A 6 sec. NB/2 A/A 10 sec. NB/4 <br /> 161st Ave/Primary(East)Site Access(1) A/b 13 sec. SB/2 A/B 12 sec. SB/1 A/A 10 sec. SB/1 <br /> 161st Ave/Secondary(West)Site Access(1) A/B 11 sec. SB/1 A/B 11 sec. SB/1 A/A 10 sec. SB/1 <br /> Ramsey Boulevard/Alpine Drive(2) B/B 14 sec. SB/2 B/B 14 sec. NB/3 B/B 14 sec. NB/3 <br /> 175th Avenue/Nowthen Boulevard (1) A/B 15 sec. EB/1 A/B 14 sec. EB/1 A/B 15 sec. EB/1 <br /> (1) Indicates a side-street stop-controlled intersection,where the overall LOS is shown followed by the worst approach LOS.The delay shown represents the <br /> worst side-street approach average delay per vehicle.The queue shown is the 95th percentile queue(in vehicles)for the worst approach at the intersection. <br /> The 95th percentile queues shown in red bold font spill back to and beyond the adjacent upstream intersection. <br /> (2) Indicates an all-way stop-controlled intersection,where the overall LOS and average delay per vehicle are shown.The queue shown is the 95th percentile <br /> queue(in vehicles)for the worst side-street approach at the intersection.The 95th percentile queues shown in red bold font spill back to and beyond the <br /> adjacent upstream intersection. <br /> (3) Indicates an improvement to provide a single-lane roundabout intersection,where the overall LOS and average delay per vehicle are shown.The queue <br /> shown is the 95th percentile queue(in vehicles)for the worst side-street approach at the intersection.The 95th percentile queues shown in red bold font <br /> spill back to and beyond the adjacent upstream intersection. <br />